DIVISION 05 : MOSAIC WORKS
181. 05.3.3 With Indian chips without glass strip In ground floor sqm 1713 1697 1646 1644
182. 05.3.4 With Pakistani chips without glass strip In ground floor sqm 1746 1730 1679 1677
183. 05.4 12 mm thick finished and laying thickness 14.5 mm silver grey cast in situ mosaic work on floor with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) including preparation of mix and laying the same over minimum 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable panels, compacting, curing at least for 7 days, cutting with pumice stone (No. 40. No. 80, No. 120) and finishing with minar stone including breaking of brick chips, screening, washing of mosaic chips and supply of all necessary materials and water, electricity and other charges in all respect and accepted by the Engineer-in-charge. (Cement: CEM-I/OPC)
184. 05.4.1 With Indian chips and glass strip In ground floor sqm 2066 2049 1988 1987
185. 05.4.2 With Pakistani chips and glass strip In ground floor sqm 2103 2086 2025 2024
186. 05.4.3 With Indian chips without glass strip In ground floor sqm 1784 1767 1716 1714
187. 05.4.4 With Pakistani chips without glass strip In ground floor sqm 1821 1804 1753 1751
188. 05.5 10 mm thick finished and laying thickness 12.5 mm cast in situ mosaic work in wall with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing 100% white cement including preparation of mix and laying the same on 12 mm thick cement plaster (1:4) to wall including compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No. 120), finishing the corners and edges and also finishing with minar stone and supplying all necessary materials including water, electricity and other charges in all respect and accepted by the Engineer-in-charge. (Cement: CEM-I/OPC)
189. 05.5.1 With Indian chips In ground floor sqm 2229 2194 2117 2117
190. 05.5.2 With Pakistani chips In ground floor sqm 2262 2227 2150 2150