List of Long Schedules
SL# Item Code Item Description Unit Rate for ZoneA
Dhaka & Mymensingh Division
Rate for ZoneB
Chattogram & Sylhet Division
Rate for ZoneC
Rajshahi & Rangpur Division
Rate for ZoneD
Khulna & Barishal Division
DIVISION 30 : CONCRETE SOLID AND HOLLOW BLOCKS, FACING AND PAVING STONES ETC.
2131. 30.36.1.2 Add for each additional floor above ground floor sqm 18 18 18 18
2132. 30.36.2 38 mm thick coloured cladding work in facing on superstructure with 200 mm x 92 mm x 38 mm size concrete clad pested with 20 mm thick cement mortar (1:4) to be placed at 6 mm apart, filling the interstices with same mortar, raking out joints and cutting the clad to required sizes wherever necessary with high class recessed pointing, cleaning and washing of sand, necessary scaffolding, curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all complete and accepted by the Engineer-in-charge.
2133. 30.36.2.1 Ground floor sqm 1708 1697 1660 1660
2134. 30.36.2.2 Add for each additional floor above ground floor sqm 18 18 18 18
2135. 30.36.3 50 mm thick grey cladding work in facing on superstructure with 400 mm x 100 mm x 50 mm size concrete clad pested with 20 mm thick cement mortar (1:4) to be placed at 6 mm apart, filling the interstices with same mortar, raking out joints and cutting the clad to required sizes wherever necessary with high class recessed pointing, cleaning and washing of sand, necessary scaffolding, curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all complete and accepted by the Engineer-in-charge.
2136. 30.36.3.1 Ground floor sqm 1339 1325 1280 1280
2137. 30.36.3.2 Add for each additional floor above ground floor sqm 18 18 18 18
2138. 30.36.4 50 mm thick coloured cladding work in facing on superstructure with 400 mm x 100 mm x 50 mm size concrete clad pested with 20 mm thick cement mortar (1:4) to be placed at 6 mm apart, filling the interstices with same mortar, raking out joints and cutting the clad to required sizes wherever necessary with high class recessed pointing, cleaning and washing of sand, necessary scaffolding, curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all complete and accepted by the Engineer-in-charge.
2139. 30.36.4.1 Ground floor sqm 1484 1470 1425 1425
2140. 30.36.4.2 Add for each additional floor above ground floor sqm 18 18 18 18