List of Long Schedules
SL# Item Code Item Description Unit Rate for ZoneA
Dhaka & Mymensingh Division
Rate for ZoneB
Chattogram & Sylhet Division
Rate for ZoneC
Rajshahi & Rangpur Division
Rate for ZoneD
Khulna & Barishal Division
DIVISION 30 : CONCRETE SOLID AND HOLLOW BLOCKS, FACING AND PAVING STONES ETC.
2171. 30.7 240 mm thick Exterior Wall with 3 Holes Concrete Hollow Block having minimum compressive strength of 15 MPa and water absorption not greater than 7% of size (240 x 114 x 70-3H) mm, laying with specified mortar of cement and sand in a ratio 1:5 (sand not less than F.M =1.2) and minimum thickness of 12 mm, filling the interstices with mortar and making bond with connecting walls /frames including necessary scaffolding and curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days curing etc. all completed by contractor and accepted by the Engineer-in-charge.
2172. 30.7.1 Ground floor cum 7205 7186 7108 7108
2173. 30.7.2 Add for each addl. floor up above ground floor cum 73 73 73 73
2174. 30.8 114 mm thick Partition Wall with 3 Holes Concrete Hollow Block having minimum compressive strength of 15 MPa and water absorption not greater than 7% of size (240 x 114 x 70-3H) mm, laying with specified mortar of cement and sand in a ratio 1:5 (sand not less than F.M =1.2) and minimum thickness of 12 mm, filling the interstices with mortar and making bond with connecting walls /frames including necessary scaffolding and curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days curing etc. all completed by contractor and accepted by the Engineer-in-charge.
2175. 30.8.1 Ground floor sqm 1116 1111 1088 1088
2176. 30.8.2 Add for each addl. floor up above ground floor sqm 36 36 36 36
2177. 30.9 240 mm thick Boundary Wall with Concrete Solid Block having minimum compressive strength of 15 MPa and water absorption not greater than 7% of size (240 x 114 x 70) mm, laying with specified mortar of cement and sand in a ratio 1:5 (sand not less than F.M =1.2) and minimum thickness of 12 mm, filling the interstices with mortar and making bond with connecting walls /frames including necessary scaffolding and curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days curing etc. all completed by contractor and accepted by the Engineer-in-charge. Cum 8978 8933 8820 8820
DIVISION 31 : SUB-SOIL INVESTIGATION WORKS & DIGITAL SURVEY
2178. Rotary Method of Drilling
2179. Cone Penetration Test (CPT)
2180. Detail digital topographic & physical feature survey