1.MARK-UPS
1-Contractor's Profit 0.1 0.1 0.1 0.1 Edit
2-Contractor's Overhead Expenses 0.035 0.035 0.035 0.035 Edit
3-VAT 0.075 0.075 0.075 0.075 Edit
4-Additional Incidental Expenses for Gas Line Installation Works 0.1 0.1 0.1 0.1 Edit
1057-Over Counter: Approx. 400X 200 mm, minimum weight 6.0 kg each 1300 1300 1300 1300 Edit
1058-Over Counter: Approx. 445X 345 mm, minimum weight 7.0 kg each 1530 1530 1530 1530 Edit
1059-Over Counter:Approx. 535X 435 mm, minimum weight 7.5 kg each 1970 1970 1970 1970 Edit
1060-Over Counter: Approx. 560 X 475 mm size, minimum weight 10.0 kg each 2050 2050 2050 2050 Edit
1061-Under Counter: Approx. 570 X 420 mm size, minimum weight 7.5 kg each 1905 1905 1905 1905 Edit
1062-Under Counter: Approx. 515 X 365 mm size, minimum weight 9.5 kg each 3225 3225 3225 3225 Edit