| 99.CARRIAGE OF MATERIALS | ||||||
| 2152-For each additional km beyond 30.0 kilometer and up to 80.0 kilometer | per M. ton | 15 | 15 | 15 | 15 | Edit |
| 2152-Beyond 80.0 kilometer | per M. ton | 10.5 | 10.5 | 10.5 | 10.5 | Edit |
| 2153-Weighing at both ends for items of steel materials only | per M. ton | 124 | 124 | 124 | 124 | Edit |
| 2154-Up to 1.5 kilometer | per % 0 nos | 355 | 355 | 355 | 355 | Edit |
| 2154-Up to 3.0 kilometer | per % 0 nos | 475 | 475 | 475 | 475 | Edit |
| 2154-Up to 5.0 kilometer | per % 0 nos | 632 | 632 | 632 | 632 | Edit |
| 2154-For each additional km beyond 5.0 kilometer and up to 30.0 kilometer | per % 0 nos | 34 | 34 | 34 | 34 | Edit |
| 2154-For each additional km beyond 30.0 kilometer and up to 80.0 kilometer | per % 0 nos | 22 | 22 | 22 | 22 | Edit |
| 2154-Beyond 80.0 kilometer | per % 0 nos | 7 | 7 | 7 | 7 | Edit |
| 100.BATCHING AND READY MIX CONCRETE | ||||||
| 2155-Hire and operational cost for batching mixture plant per cum (excluding fuel) = | per cum | 273 | 273 | 273 | 273 | Edit |