List of Basic Item

Create New Item



Item Code and Name Unit Rate for Zone-A
Dhaka & Mymensingh Division
Rate for Zone-B
Chattogram & Sylhet Division
Rate for Zone-C
Rajshahi & Rangpur Division
Rate for Zone-D
Khulna & Barishal Division
99.CARRIAGE OF MATERIALS
2154-Up to 1.5 kilometer per % 0 nos 355 355 355 355 Edit
2154-Up to 3.0 kilometer per % 0 nos 475 475 475 475 Edit
2154-Up to 5.0 kilometer per % 0 nos 632 632 632 632 Edit
2154-For each additional km beyond 5.0 kilometer and up to 30.0 kilometer per % 0 nos 34 34 34 34 Edit
2154-For each additional km beyond 30.0 kilometer and up to 80.0 kilometer per % 0 nos 22 22 22 22 Edit
2154-Beyond 80.0 kilometer per % 0 nos 7 7 7 7 Edit
100.BATCHING AND READY MIX CONCRETE
2155-Hire and operational cost for batching mixture plant per cum (excluding fuel) = per cum 273 273 273 273 Edit
2156-Hire and operational cost for pay loader per cum (excluding fuel) per cum 131 131 131 131 Edit
2157-Hire and operational cost of pump machine (excluding fuel) per cum 206 206 206 206 Edit
2158-Hire and operational cost of transit mixture (excluding fuel) per cum 143 143 143 143 Edit

Help