List of Basic Item

Create New Item



Item Code and Name Unit Rate for Zone-A
Dhaka & Mymensingh Division
Rate for Zone-B
Chattogram & Sylhet Division
Rate for Zone-C
Rajshahi & Rangpur Division
Rate for Zone-D
Khulna & Barishal Division
100.BATCHING AND READY MIX CONCRETE
2159-Production cost of Ready Mix Concrete (excluding material cost) including carrying and pumping at site per cum 410 410 410 410 Edit
2160-Water reducing high range chemical (for batching/RMC) admixture Type G per kg 140 140 140 140 Edit
2161-Micro Silica (for high strength concrete) per kg 80 80 80 80 Edit
101.SECONDARY INPUT FOR RCC WORKS
0-Materials (From Secondary Input : Item B-3) 18275 0 0 0 Edit
0-Laying/placing concrete (@ 1200 cft concreting using 1 mixer machine in one day) (From Secondary Input : Item A-1) cft per day 1657.916666 0 0 0 Edit
0-Laying/placing concrete (@ 800 cft concreting using 1 mixer machine in one day) (From Secondary Input : Item A-3) cft per day 2486.875 0 0 0 Edit
0-Laying/placing concrete (@ 1000 cft concreting using 1 mixer machine in one day)(From Secondary Input : Item A-2) cft per day 1989.5 0 0 0 Edit
0-Laying/placing concrete (@ 600 cft concreting using 1 mixer machine in one day)(From Secondary Input : Item A-4) cft per day 3315.833333 0 0 0 Edit
0-Materials (From Secondary Input : Item B-4) 29466.5 0 0 0 Edit
0-Materials (From Secondary Input : Item B-5) 30248.5 0 0 0 Edit

Help