| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 103.SECONDARY INPUTS | ||||||
| 21-Concrete for slab (1:2:4) | % cft | 20355.5 | 20355.5 | 20355.5 | 20355.5 | Edit |
| 22-Concrete for wall (1:2:4) | % cft | 20855.38 | 20855.38 | 20855.38 | 20855.38 | Edit |
| 23-5" / 125 mm brickwork (1:4) | % sft | 8986.75 | 8986.75 | 8986.75 | 8986.75 | Edit |
| 24-5" / 125 mm brickwork (1:6) | % sft | 8794.75 | 8794.75 | 8794.75 | 8794.75 | Edit |
| 25-Earthwork in excavation | % 0 cft | 4979.17 | 4979.17 | 4979.17 | 4979.17 | Edit |
| 26-Synthetic Enamel paint | % sft | 1795.26 | 1795.26 | 1795.26 | 1795.26 | Edit |
| 27-French polish | % sft | 3424.15 | 3424.15 | 3424.15 | 3424.15 | Edit |
| 28-Sand fill (0.8) | % cft | 2692.67 | 2692.67 | 2692.67 | 2692.67 | Edit |
| 29-40 Grade rebar in concrete | Ibs | 673.92 | 673.92 | 673.92 | 673.92 | Edit |
| 104.EXCEPTIONAL GROUP | ||||||
| 1-Workshop Charge 18.4.7 | Unit | 0 | 0 | 0 | 0 | Edit |