Item Code and Name Unit Rate for Zone-A
Dhaka & Mymensingh Division
Rate for Zone-B
Chattogram & Sylhet Division
Rate for Zone-C
Rajshahi & Rangpur Division
Rate for Zone-D
Khulna & Barishal Division
103.SECONDARY INPUTS
6-(1:1.5:3) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 % cft 30285.02 30285.02 30285.02 30285.02 Edit
6-T-L-R beam (Steel) per sqm 467.7 467.7 467.7 467.7 Edit
6-T-L-R beam (Wooden) per sqm 413.55 413.55 413.55 413.55 Edit
6-Labour cost of mosaic with glass strip % sft 6012.5 6012.5 6012.5 6012.5 Edit
7-Labour cost of mosaic without glass strip % sft 5075 5075 5075 5075 Edit
7-Floor/Roof slab (Wooden) per sqm 457.04 457.04 457.04 457.04 Edit
7-Floor/Roof slab (Steel) per sqm 486.1 486.1 486.1 486.1 Edit
7-(1:1.25:2.5) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 % cft 30980.2 30980.2 30980.2 30980.2 Edit
8-(1:1:2) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 % cft 32090.44 32090.44 32090.44 32090.44 Edit
8-Waffel / ribbed slab (Steel) per sqm 586.75 586.75 586.75 586.75 Edit