| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 101.SECONDARY INPUT FOR RCC WORKS | ||||||
| 0-Materials (From Secondary Input : Item C-20) | 0 | 0 | 0 | 0 | Edit | |
| 0-Materials (From Secondary Input : Item C-21) | 0 | 0 | 0 | 0 | Edit | |
| 0-Materials (From Secondary Input : Item C-22) | 0 | 0 | 0 | 0 | Edit | |
| 102.SPECIAL GROUP | ||||||
| 3000-LUMSUM | 0 | 0 | 0 | 0 | Edit | |
| 103.SECONDARY INPUTS | ||||||
| 1-Palesading (Item 186) | sft | 46.4 | 46.4 | 46.4 | 46.4 | Edit |
| 1-Colum footing (Wooden) | per sqm | 425.82 | 425.82 | 425.82 | 425.82 | Edit |
| 1-Colum footing (Steel) | per sqm | 473.94 | 473.94 | 473.94 | 473.94 | Edit |
| 1-(1:3:6) with BRICK CHIPS and sand of F.M. 1.2 | % cft | 14983 | 14983 | 14983 | 14983 | Edit |
| 1-Laying concrete (1200 cft per day using one mixture machine) | % cft | 1666.25 | 1666.25 | 1666.25 | 1666.25 | Edit |
| 1-Built-up MS Sections | per kg | 111.48 | 111.48 | 111.48 | 111.48 | Edit |