List of Basic Item

Create New Item



Item Code and Name Unit Rate for Zone-A
Dhaka & Mymensingh Division
Rate for Zone-B
Chattogram & Sylhet Division
Rate for Zone-C
Rajshahi & Rangpur Division
Rate for Zone-D
Khulna & Barishal Division
101.SECONDARY INPUT FOR RCC WORKS
0-Materials (From Secondary Input : Item C-20) 0 0 0 0 Edit
0-Materials (From Secondary Input : Item C-21) 0 0 0 0 Edit
0-Materials (From Secondary Input : Item C-22) 0 0 0 0 Edit
102.SPECIAL GROUP
3000-LUMSUM 0 0 0 0 Edit
103.SECONDARY INPUTS
1-Palesading (Item 186) sft 46.4 46.4 46.4 46.4 Edit
1-Colum footing (Wooden) per sqm 425.82 425.82 425.82 425.82 Edit
1-Colum footing (Steel) per sqm 473.94 473.94 473.94 473.94 Edit
1-(1:3:6) with BRICK CHIPS and sand of F.M. 1.2 % cft 14983 14983 14983 14983 Edit
1-Laying concrete (1200 cft per day using one mixture machine) % cft 1666.25 1666.25 1666.25 1666.25 Edit
1-Built-up MS Sections per kg 111.48 111.48 111.48 111.48 Edit