| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 103.SECONDARY INPUTS | ||||||
| 2-Laying concrete (1000 cft per day using one mixture machine) | % cft | 1999.5 | 1999.5 | 1999.5 | 1999.5 | Edit |
| 2-(1:2:4) with BRICK CHIPS and sand of F.M. 1.2 | % cft | 17573 | 17573 | 17573 | 17573 | Edit |
| 2-Raft / mat (Steel) | per sqm | 478.03 | 478.03 | 478.03 | 478.03 | Edit |
| 2-Raft / mat (Wooden) | per sqm | 403.11 | 403.11 | 403.11 | 403.11 | Edit |
| 2-Bamboo driving (Item 185) | rft | 22.44 | 22.44 | 22.44 | 22.44 | Edit |
| 3-25 mm thick patent stone (1:2:4) with brick/chips for mosaic work | % sft | 3307.74 | 3307.74 | 3307.74 | 3307.74 | Edit |
| 3-Foundation beam (Wooden) | per sqm | 386.97 | 386.97 | 386.97 | 386.97 | Edit |
| 3-Foundation beam (Steel) | per sqm | 401.39 | 401.39 | 401.39 | 401.39 | Edit |
| 3-(1:2:4) with BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion) | % cft | 18356 | 18356 | 18356 | 18356 | Edit |
| 3-Laying concrete (800 cft per day using one mixture machine) | % cft | 2499.38 | 2499.38 | 2499.38 | 2499.38 | Edit |