11.STEEL
331-8 mm thick double bubble insulation per sqm 147 147 147 147 Edit
332-Fabrication charge for decking panel per M.Ton 9000 9000 9000 9000 Edit
333-Fabrication charge for Purlin per M.Ton 8400 8400 8400 8400 Edit
334-Erection charge for built-up or hot rolled sections per M.Ton 9600 9600 9600 9600 Edit
335-Erection charge for decking panel per Kg 8 8 8 8 Edit
336-Erection charge for purlin per Kg 4 4 4 4 Edit
337-Erection charge for roof/wall sheet including flashing and trims per Kg 8 8 8 8 Edit
338-Fitting and fxing of dubble bubble insulation on roof and wall sqm 50 50 50 50 Edit
339-CNC Machine cutting sft 155 155 155 155 Edit
340-Safety Shade( with 22BWG MS sheet) sft 42.75 42.75 42.75 42.75 Edit