| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 11.STEEL | ||||||
| 331-8 mm thick double bubble insulation | per sqm | 147 | 147 | 147 | 147 | Edit |
| 332-Fabrication charge for decking panel | per M.Ton | 9000 | 9000 | 9000 | 9000 | Edit |
| 333-Fabrication charge for Purlin | per M.Ton | 8400 | 8400 | 8400 | 8400 | Edit |
| 334-Erection charge for built-up or hot rolled sections | per M.Ton | 9600 | 9600 | 9600 | 9600 | Edit |
| 335-Erection charge for decking panel | per Kg | 8 | 8 | 8 | 8 | Edit |
| 336-Erection charge for purlin | per Kg | 4 | 4 | 4 | 4 | Edit |
| 337-Erection charge for roof/wall sheet including flashing and trims | per Kg | 8 | 8 | 8 | 8 | Edit |
| 338-Fitting and fxing of dubble bubble insulation on roof and wall | sqm | 50 | 50 | 50 | 50 | Edit |
| 339-CNC Machine cutting | sft | 155 | 155 | 155 | 155 | Edit |
| 340-Safety Shade( with 22BWG MS sheet) | sft | 42.75 | 42.75 | 42.75 | 42.75 | Edit |