| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 11.STEEL | ||||||
| 341-Safety Net (chain link with 24BWG wire net) | sft | 25 | 25 | 25 | 25 | Edit |
| 342-Erection and de-installation | per Kg | 16 | 16 | 16 | 16 | Edit |
| 343-Galvaniztion at plant | per Kg | 55 | 55 | 55 | 55 | Edit |
| 344-Anti corrosive epoxy paint | per litre | 950 | 950 | 950 | 950 | Edit |
| 345-Anti corrosive red oxide paint | per litre | 180 | 180 | 180 | 180 | Edit |
| 346-Thinner for anti corrosive red oxide paint | per litre | 120 | 120 | 120 | 120 | Edit |
| 347-Red Oxide Primer | per kg | 3.24 | 3.24 | 3.24 | 3.24 | Edit |
| 348-Labour charge for redoxide painting | per M.Ton | 600 | 600 | 600 | 600 | Edit |
| 349-Labour charge for enamel painting | per M.Ton | 3500 | 3500 | 3500 | 3500 | Edit |
| 350-Labour charge for application of non-shrink grout including the cost of making shutter | per cft | 50 | 50 | 50 | 50 | Edit |