341. Schedule of Rate-2021 337 Erection charge for roof/wall sheet including flashing and trims 8 8 8 8 Edit
342. Schedule of Rate-2021 338 Fitting and fxing of dubble bubble insulation on roof and wall 50 50 50 50 Edit
343. Schedule of Rate-2021 339 CNC Machine cutting 155 155 155 155 Edit
344. Schedule of Rate-2021 340 Safety Shade( with 22BWG MS sheet) 42.75 42.75 42.75 42.75 Edit
345. Schedule of Rate-2021 341 Safety Net (chain link with 24BWG wire net) 25 25 25 25 Edit
346. Schedule of Rate-2021 342 Erection and de-installation 16 16 16 16 Edit
347. Schedule of Rate-2021 343 Galvaniztion at plant 55 55 55 55 Edit
348. Schedule of Rate-2021 344 Anti corrosive epoxy paint 950 950 950 950 Edit
349. Schedule of Rate-2021 345 Anti corrosive red oxide paint 180 180 180 180 Edit
350. Schedule of Rate-2021 346 Thinner for anti corrosive red oxide paint 120 120 120 120 Edit