351. Schedule of Rate-2021 347 Red Oxide Primer 3.24 3.24 3.24 3.24 Edit
352. Schedule of Rate-2021 348 Labour charge for redoxide painting 600 600 600 600 Edit
353. Schedule of Rate-2021 349 Labour charge for enamel painting 3500 3500 3500 3500 Edit
354. Schedule of Rate-2021 350 Labour charge for application of non-shrink grout including the cost of making shutter 50 50 50 50 Edit
355. Schedule of Rate-2021 351 16 mm steel wire 126 126 126 126 Edit
356. Schedule of Rate-2021 352 16 mm I bolt with heal side washer and clamp 178 178 178 178 Edit
357. Schedule of Rate-2021 353 12 mm I bolt with heal side washer and clamp 157 157 157 157 Edit
358. Schedule of Rate-2021 354 Shear stud of variable dia of grade 275 Mpa 126 126 126 126 Edit
359. Schedule of Rate-2021 355 Making thread for sag rod 13 13 13 13 Edit
360. Schedule of Rate-2021 356 Nut with washer for 12 mm dia sag rod 155 155 155 155 Edit