| 3931. |
Schedule of Rate-2023
|
2156
|
Hire and operational cost for pay loader per cum (excluding fuel)
|
131
|
131
|
131
|
131
|
Edit
|
| 3932. |
Schedule of Rate-2023
|
2157
|
Hire and operational cost of pump machine (excluding fuel)
|
206
|
206
|
206
|
206
|
Edit
|
| 3933. |
Schedule of Rate-2023
|
2158
|
Hire and operational cost of transit mixture (excluding fuel)
|
143
|
143
|
143
|
143
|
Edit
|
| 3934. |
Schedule of Rate-2023
|
2159
|
Production cost of Ready Mix Concrete (excluding material cost) including carrying and pumping at site
|
410
|
410
|
410
|
410
|
Edit
|
| 3935. |
Schedule of Rate-2023
|
2160
|
Water reducing high range chemical (for batching/RMC) admixture Type G
|
140
|
140
|
140
|
140
|
Edit
|
| 3936. |
Schedule of Rate-2023
|
2161
|
Micro Silica (for high strength concrete)
|
80
|
80
|
80
|
80
|
Edit
|
| 3937. |
Schedule of Rate-2023
|
1403
|
100 mm x 100 mm x 6 mm SS base plate
|
200
|
200
|
200
|
200
|
Edit
|
| 3938. |
Schedule of Rate-2023
|
1404
|
65mm x 55mm, 6 mm thick SS Plate
|
173
|
173
|
173
|
173
|
Edit
|
| 3939. |
Schedule of Rate-2023
|
1405
|
Solid SS royal bolt with cap
|
40
|
40
|
40
|
40
|
Edit
|
| 3940. |
Schedule of Rate-2023
|
1406
|
75mm dia SS Wheel
|
1800
|
1800
|
1800
|
1800
|
Edit
|