SL# Item Code Item Description Unit Rate for ZoneA
Dhaka & Mymensingh Division
Rate for ZoneB
Chattogram & Sylhet Division
Rate for ZoneC
Rajshahi & Rangpur Division
Rate for ZoneD
Khulna & Barishal Division
DIVISION 03 : BRICK SOLING, CC, DPC ETC.
101. 03.3.1 Brick on end edging with 1st class brick (BDS 208) including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge meter 121 121 118 116
102. 03.3.2 Brick on end edging with Automatic machine made 1st class brick (240x114x70)mm including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge meter 137 136 135 135
103. 03.3.3 Brick on end edging with Sand Cement Solid block (SCSB) (250x115x115)mm including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge meter 142 141 140 140
104. 03.4 Lean / blinding concrete (1:3:6) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by the Engineer-in-charge.(Cement: CEM-II/B-M)
105. 03.4.1 Lean / blinding concrete in foundation (1:3:6) with cement, brick chips and sand of F.M. 1.2 cum 7781 7710 7548 7482
106. 03.4.2 Lean / blinding concrete in floor (1:3:6) with cement, brick chips and sand of F.M. 1.2 cum 7610 7539 7381 7314
107. 03.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/B-M)
108. 03.5.1 Mass concrete in foundation (1:2:4) with brick chips and local sand of F.M. 1.2. cum 8903 8889 8727 8661
109. 03.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2. cum 8732 8718 8560 8493
110. 03.6 Damp proof course (DPC) (1:1.5:3) of cement concrete with cement, sand and picked jhama brick chips or stone chips including breaking of chips, screening, centering, shuttering, casting, curing and finishing with a coat of bitumen including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/B-M)