| DIVISION 03 : BRICK SOLING, CC, DPC ETC. | |||||||
| 101. | 03.3.1 | Brick on end edging with 1st class brick (BDS 208) including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge | meter | 121 | 121 | 118 | 116 |
| 102. | 03.3.2 | Brick on end edging with Automatic machine made 1st class brick (240x114x70)mm including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge | meter | 137 | 136 | 135 | 135 |
| 103. | 03.3.3 | Brick on end edging with Sand Cement Solid block (SCSB) (250x115x115)mm including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge | meter | 142 | 141 | 140 | 140 |
| 104. | 03.4 | Lean / blinding concrete (1:3:6) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by the Engineer-in-charge.(Cement: CEM-II/B-M) | |||||
| 105. | 03.4.1 | Lean / blinding concrete in foundation (1:3:6) with cement, brick chips and sand of F.M. 1.2 | cum | 7781 | 7710 | 7548 | 7482 |
| 106. | 03.4.2 | Lean / blinding concrete in floor (1:3:6) with cement, brick chips and sand of F.M. 1.2 | cum | 7610 | 7539 | 7381 | 7314 |
| 107. | 03.5 | Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/B-M) | |||||
| 108. | 03.5.1 | Mass concrete in foundation (1:2:4) with brick chips and local sand of F.M. 1.2. | cum | 8903 | 8889 | 8727 | 8661 |
| 109. | 03.5.2 | Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2. | cum | 8732 | 8718 | 8560 | 8493 |
| 110. | 03.6 | Damp proof course (DPC) (1:1.5:3) of cement concrete with cement, sand and picked jhama brick chips or stone chips including breaking of chips, screening, centering, shuttering, casting, curing and finishing with a coat of bitumen including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/B-M) | |||||