| SL# | Item Code | Item Description | Unit |
Rate for ZoneA Dhaka & Mymensingh Division |
Rate for ZoneB Chattogram & Sylhet Division |
Rate for ZoneC Rajshahi & Rangpur Division |
Rate for ZoneD Khulna & Barishal Division |
|---|---|---|---|---|---|---|---|
| DIVISION 02 : EXCAVATION, FILLING & SITE DEVELOPMENT AND PALISADING | |||||||
| 81. | 02.18.1 | For initial lead of 30 m and lift of 1.5 m | cum | 281 | 277 | 257 | 257 |
| 82. | 02.18.2 | Added for each additional lift of 0.3 m beyond 1.5 m and up to 3 m | cum | 12 | 12 | 11 | 11 |
| 83. | 02.18.3 | Added for each additional lift of 0.3 m beyond 3 m and up to 4.5 m | cum | 18 | 18 | 16 | 16 |
| 84. | 02.18.4 | Added for each additional lift of 0.3 m beyond 4.5 m and up to 6 m | cum | 24 | 23 | 22 | 22 |
| 85. | 02.18.5 | Added for each additional lead of 30 m or part thereof beyond initial lead 30 meter | cum | 36 | 35 | 32 | 32 |
| 86. | 02.19.1 | Bailing out water by 1 cusec diesel operated pump including hire charge of pump, fuel, operator, spares and maintenance etc. all complete and accepted by by the Engineer-in-charge. | per hour | 677 | 670 | 644 | 644 |
| 87. | 02.19.2 | Bailing out water by 1 cusec electricity operated pump including hire charge of pump, fuel, operator, spares and maintenance etc. all complete and accepted by the Engineer-in-charge. | per hour | 562 | 556 | 530 | 530 |
| 88. | 02.2 | Bailing out of trapped water caused by inundation or rain, by pump from foundation trenches. | hour | 474 | 474 | 458 | 458 |
| 89. | 02.3 | Supplying of straight and strong borrak bamboo posts of having minimum 75 mm diameter althrough and driving the same vertically in the ground up to required depth by any means shaping the top of the post, all complete and accepted by the Engineer-in-charge. | meter | 90 | 90 | 81 | 81 |
| 90. | 02.4 | Supplying of wooden ballah having an average diameter not less than 150 mm (without barks) at one third distance from larger end with a minimum end diameter of 100 mm for retaining purpose and driving to a depth as per design and drawing by any method including all arrangement for staging, hoisting, carrying etc. complete and accepted by the Engineer-in-charge. | meter | 747 | 738 | 702 | 702 |