| SL# | Item Code | Item Description | Unit |
Rate for ZoneA Dhaka & Mymensingh Division |
Rate for ZoneB Chattogram & Sylhet Division |
Rate for ZoneC Rajshahi & Rangpur Division |
Rate for ZoneD Khulna & Barishal Division |
|---|---|---|---|---|---|---|---|
| DIVISION 24 : ROAD AND PAVEMENT WORKS | |||||||
| 1271. | 24.18.1 | Providing seal coat with 4 cft of Sylhet sand (FM 2.2) mixed with @ 7.32 kg of bitumen (60/70 penetration grade) per 10 sqm of road surface including supplying and spreading of dry sand (F.M. 0.80) @ 0.09 cum per 10 sqm, including heating bitumen upto 176°C to 190°C, and spreading, rolling at a temperature not below 90°C celsius with appropriate steel drum roller (3 -5 ton) and pneumatic multiple tire roller (8-10 tons) to the desired compaction etc. all complete (cost of bitumen included ) and accepted by the Engineer-in-charge. | sqm | 132 | 131 | 131 | 130 |
| 1272. | 24.18.2 | Premixed bituminous seal coat with 0.12 cum of pea gravels mixed with 80 kg of bitumen (60/70 penetration grade) per cum of pea gravels and laid over 10 sqm road surface, spreading with proper camber, grade, surface blinding with dry sand (F.M. 1.2) @ 0.09 cum per 10 sqm, rolling at a temperature not below 90°C with appropriate steel drum roller (3-5 ton) and pneumatic multiple tire roller (8-10 tons) to the desired compaction etc. all complete and accepted by the Engineer-in-charge. | sqm | 179 | 177 | 174 | 174 |
| 1273. | 24.19.1 | Providing prime coat @ 1.2 liter/sqm with cutback bitumen to be prepared by cutting back 60/70 penetration grade bitumen in the ratio of 100 parts by volume of bitumen to 40-60 parts by volume of kerosene depending on the porosity of surface and will be decided by field trials, carefully cleaning of the surface of base material to be primed and spraying cutback bitumen at a temperature from 100 degree celcius to 120 degree celcius by appropriate hand device etc.all complete as per direction of the Engineer-in-charge. | sqm | 110 | 109 | 111 | 111 |
| 1274. | 24.19.2 | Providing prime coat @1.2 liter/sqm with cutback bitumen to be prepared by cutting back 60/70 penetration grade bitumen in the ratio of 100 parts by volume of bitumen to 40-60 parts by volume of kerosene depending on the porosity of surface and will be decided by field trials, carefully cleaning of the surface of base material to be primed and spraying cutback bitumen at a temperature from 100°C to 120°C by mechanical distributor etc. all complete as per direction of the Engineer-in-charge. | sqm | 111 | 110 | 112 | 112 |
| 1275. | 24.2 | Earthwork in box cutting in all types of soil. Removing soil to a safe distance, maintaining proper alignment, camber and grade including leveling, dressing and compacting the sub grade as per drawing and accepted by the Engineer-in-charge. | |||||
| 1276. | 24.2.1 | Depth up to 300 mm | sqm | 66 | 65 | 60 | 60 |
| 1277. | 24.2.2 | Depth up to 450 mm | sqm | 99 | 97 | 90 | 90 |
| 1278. | 24.20 | Providing painting at the top of the road surface as road marking in two coats with approved best quality and colour of synthetic paint from authorized local agent of the manufacturer in a sealed container having high water resistance, high bondability & flexibility, using specific brand thinner applied by brass/ roller or others over a coat of priming, providing elapsing time for drying including surface cleaning from dust, oil or dirt, smoothening, finishing necessary tools etc. all complete & approved and accepted by the Engineer-in-charge. | sqm | 371 | 364 | 345 | 345 |
| 1279. | 24.21 | Providing expansion joints across the R.C.C. road pavement with 20 mm gap between the adjacent panels. Supplying dowel bars of size 12 mm dia and 600 mm long M.S rod placed @ 750 mm c/c. 300 mm of the bar being fixed within one slab keeping remaining portion the bar free within the adjacent slab being inserted in 20 mm dia and 300 mm long P.V.C. pipe embedded in the slab, inside of pipe fully greased, filling the gap between the slabs (with admixture) of hot bitumen and coarse sand (F.M. 2.2) in proportion of 2:1, finishing the top with bitumen, spreading coarse sand over the joint, all complete as per plan, drawing and accepted by the Engineer-in-charge. | meter | 390 | 386 | 372 | 372 |
| 1280. | 24.22 | Providing Stamped Concrete or decorative concrete flooring on RCC Casting in colored and textured form accomplished with the application of high Abrasion and UV resistant, non-fading pigment and long-wearing surface color hardener in three shakes, antiquing by using of a powdered Release Agent in a contrasting color and sealed by a Solvent-Borne Acrylic Sealer for chemical resistant according to ASTM D 543 : 95 and moisture resistant according to ASTM C 156 and stain resistant according to ASTM D 1308, providing a deep penetrating, scruff-resistance finish. | sqm | 2318 | 2318 | 2305 | 2305 |