| SL# | Item Code | Item Description | Unit |
Rate for ZoneA Dhaka & Mymensingh Division |
Rate for ZoneB Chattogram & Sylhet Division |
Rate for ZoneC Rajshahi & Rangpur Division |
Rate for ZoneD Khulna & Barishal Division |
|---|---|---|---|---|---|---|---|
| DIVISION 27 : DEEP TUBE-WELL | |||||||
| 1741. | Mobilization: Preparation for installation of tube-well and transportation of complete boring equipments, labour and materials to the work site and remove the materials after completion of the works. Installation of drilling rig and accessories, making arrangements for electricity, water, labour shed, site office and stores, digging mud pit etc, leveling, dressing and clearing of the site as per original condition and a testing for discharge using minimum 1000 liter water tub etc. all complete as per specifications and accepted by the Engineer-in-charge. | ||||||
| 1742. | Preparation and making gravel pack around the tube well fixtures with supply of designed graded pea gravels free from any substance harmful to pipe and health confirmed by test (Passing through #10 mesh and retained on #40 mesh) including sieving, washing etc. complete as per standard specification and accepted by the Engineer-in-charge. (The rate is inclusive of the cost of extra amount required for caving and extra depth below the tube well fixtures, shrouding should not be more than 15 m above the strainer and measurement should be allowed from bottom of the tube-well fixture to top of the gravel pack) | cum | 5484 | 5468 | 4987 | 4987 | |
| 1743. | Making a sanitary seal up to a minimum depth of 6 meter from G.L. or as specified including the supply of approved quality of cement, sand and khoa (12 mm down graded) in a ratio of (1:1:5:3) as per standard specification and accepted by the Engineer-in-charge. | cum | 9531 | 9535 | 9373 | 9301 | |
| 1744. | INSTALLATION OF 50 mm x 125 mm DIA SHROUDED | ||||||
| 1745. | PRODUCTION WELL WITH PVC PIPE | ||||||
| 1746. | Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as per ISO 7686, minimum required strength 25 MPa conforming to BDS-1:2013, 4.4.1, 4.4.2 at working site as per standard practice and accepted by the Engineer-in-charge. Note : Pipe size (Wall Thickness) will be chosen as per table page no: ) | ||||||
| 1747. | Boring by using 100 mm dia cutter and 40 mm dia heavy type G.I pipe (wall thickness 2.9 mm, outside diameter min 47.8 mm, weight 3.517 kg/m, capable to withstand 50 kg/cm2 pressure) and other equipments capable of drilling up to a depth of 500 meter by water jet system through all sorts of soil strata providing protection of caving by supplying necessary casing pipe. Collection of soil samples at every 3 meter interval and at every change of soil strata and preserving them in a controlled environment for analysis and laboratory test. Finally, withdrawal of boring and casing pipes etc. complete and accepted by the Engineer-in-charge. | ||||||
| 1748. | Complete development of the well by suitable air compressor and pump of suitable capacity by alternate surging and pumping untill satisfactory yield, sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding) | ||||||
| 1749. | Complete installation of 50 mm dia uPVC tube well fixtures such as expanded top or furnishing pipe, reducer, tube well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing with best quality PVC solution, iron screws and PVC tape, sockets and placing in position with proper size M.S. centralizer @ 3.0 meter c/c in strainer portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. | meter | 105 | 103 | 99 | 99 | |
| 1750. | Complete development of the tube well by air compressor and pump of suitable capacity by alternate surging and pumping or any specified method until satisfactory yield is achieved in sand and turbid free water confirmed by laboratory test using necessary quantity of cologne and conducting step drawn-down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding) | ||||||