DIVISION 27 : DEEP TUBE-WELL
1771. Boring: Execution of 600 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter). Boring for 600 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval or as required and at every change in soil stratum including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from E.G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth or of further boring required due to caving and siltation)
1772. Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as per ISO 7686, minimum required strength 25 MPa conforming to BDS-1878:2014, 4.4.1, 4.4.2 at working site as per standard practice and accepted by the Engineer-in-charge.
1773. Complete installation of 100 mm dia uPVC tube-well fixtures such as expanded top pipes,. reducer, tube-well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing with best quality PVC solution, iron screws and uPVC tape and placing in position with proper size M.S. centralizer @ 3 meter c/c. in strainer portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. meter 133 131 126 126
1774. Complete development of the tube-well by air compressor and pump of suitable capacity by alternate surging and pumping until satisfactory yield of sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding)
1775. Complete installation of 150 mm dia uPVC tube-well fixtures such as expanded top pipes, reducer, tube-well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing with best quality uPVC solution, iron screws and uPVC tape and placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. meter 129 127 124 124
1776. Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding)
1777. Protective top cover: Supplying fitting and fixing of best quality 250 mm dia 4 mm thick M.S. pipe 1.0 m (3'-4") long one end blocked with 300 dia 4 mm thick M.S. plate and other end minimum 300 (1'-0") embedded in sanitary seal for protection of uPVC Housing pipe as per standard specification and accepted by the Engineer-in-charge. each 10956 10925 10803 10803
1778. INSTALLATION OF 150 mm x 300 mm DIA SHROUDED
1779. PRODUCTION WELL WITH G.I. PIPE
1780. Boring: Execution of 600 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) for boring 600 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at every change of formation including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth of boring required for caving and siltation)