List of Long Schedules
SL# Item Code Item Description Unit Rate for ZoneA
Dhaka & Mymensingh Division
Rate for ZoneB
Chattogram & Sylhet Division
Rate for ZoneC
Rajshahi & Rangpur Division
Rate for ZoneD
Khulna & Barishal Division
DIVISION 28 : GAS CONNECTION WORKS
2071. 28.7 Supplying, fitting and fixing of ball valve class 150 RF including supplying of 2 Nos. flange along with necessary nuts and bolts, welding the flange etc. all complete in all respect as per specification of Titas Gas T and D Co. Ltd. approved and accepted by the Engineer-in-charge.
2072. 28.7.1 50 mm ball valve class 150 RF. 2" dia each 18713 17862 17491 17491
2073. 28.7.2 25 mm ball valve class 150 RF.1" dia each 14479 13800 13428 13428
2074. 28.8 Riser Pipe line installation: Installation of 2 psi, APl, 5L, Grade-B, ERW Natural pipe line for supplying Titas Gas including, supplying, fitting, fixing and laying different sizes M.S. pipes with necessary tape and painting in all respect as per specification of Titas Gas T and D Co. Ltd. and accepted by the Engineer-in-charge. [Rate is excluding the cost of welding and tee, elbow socket etc fittings ] (Pipes manufactured by National Tubes Limited under Steel & Engineeing Corporation, Ministry of Industries, Government of Bangladesh shall be given priority)
2075. 28.8.1 12 mm N.D. with wall thickness 2 mm each 319 318 312 312
2076. 28.8.2 20 mm N.D.with wall thickness 2.35 mm each 387 385 379 379
2077. 28.9 Supplying, fitting and fixing in position different dia one-way brass stop cock (best quality and heavy type) etc. complete in all respect as per specification of Titas Gas T and D Co. Ltd. approved and accepted by the Engineer-in-charge.
2078. 28.9.1 12 mm x 6 mm N.D. each 404 387 384 384
2079. 28.9.2 20 mm x 20 mm N.D. each 729 698 694 694
DIVISION 29 : TERMITE TREATMENT WORKS
2080. 29.1 Supplying anti-termite chemicals named DURS BAN 20 EC / equivalent and mixing the same with pure water in required proportion (For DURSBAN 20 EC I Liter in 19 liters of pure water) and spraying the emulsified mixture @ 5 liters per square meter of soil surface by chemical sprayer or by any other means to the sides and bottom of the foundation trench and over plinth filling or floor bed accepted by the Engineer-in-charge. sqm 337 337 336 336
Help