| SL# | Item Code | Item Description | Unit |
Rate for ZoneA Dhaka & Mymensingh Division |
Rate for ZoneB Chattogram & Sylhet Division |
Rate for ZoneC Rajshahi & Rangpur Division |
Rate for ZoneD Khulna & Barishal Division |
|---|---|---|---|---|---|---|---|
| DIVISION 30 : CONCRETE SOLID AND HOLLOW BLOCKS, FACING AND PAVING STONES ETC. | |||||||
| 2091. | 30.11 | 240 mm thick Boundary Wall with Concrete Hollow Block having minimum compressive strength of 15 MPa of size (390 x 190 x 240) mm, thickness of individual Block Shell should not be less than 32 mm, water absorption not more than 7%, laying with specified mortar of cement and sand in a ratio 1:4 (sand not less than F.M =1.2) and minimum thickness of 15 mm (9 mm for shell portion and 6 mm for inside hollow portion), filling the interstices with mortar and making bond with connecting walls /frames including necessary scaffolding and curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days curing etc. all completed by contractor and accepted by the Engineer-in-charge. | sqm | 1908 | 1902 | 1879 | 1879 |
| 2092. | 30.12 | 112 mm thick Boundary Wall with Concrete Hollow Block having minimum compressive strength of 10 MPa of size (390 x 190 x 112) mm, thickness of individual Block Shell should not be less than 25 mm, water absorption not more than 7%, laying with specified mortar of cement and sand in a ratio 1:4 (sand not less than F.M =1.2) minimum thickness of 15 mm (9 mm for shell portion and 6 mm for inside hollow portion), filling the interstices with mortar and making bond with connecting walls /frames including necessary scaffolding and curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days curing etc. all completed by contractor and accepted by the Engineer-in-charge. | sqm | 1016 | 1011 | 987 | 987 |
| 2093. | 30.13 | 240 mm thick Boundary Wall with 3 Holes Concrete Hollow Block having minimum compressive strength of 15 MPa of size (240 x 114 x 70 -3H) mm, thickness of individual Block Shell should not be less than 32 mm, water absorption not more than 7%, laying with specified mortar of cement and sand in a ratio 1:4 (sand not less than F.M =1.2) and minimum thickness of 15 mm (9 mm for shell portion and 6 mm for inside hollow portion), filling the interstices with mortar and making bond with connecting walls /frames including necessary scaffolding and curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days curing etc. all completed by contractor and accepted by the Engineer-in-charge. | cum | 7205 | 7186 | 7108 | 7108 |
| 2094. | 30.14 | 114 mm thick Boundary Wall with 3 Holes Concrete Hollow Block having minimum compressive strength of 10 MPa of size (240 x 114 x 70 - 3H) mm, thickness of individual Block Shell should not be less than 25 mm, water absorption not more than 7%, laying with specified mortar of cement and sand in a ratio 1:4 (sand not less than F.M =1.2) minimum thickness of 15 mm (9 mm for shell portion and 6 mm for inside hollow portion), filling the interstices with mortar and making bond with connecting walls /frames including necessary scaffolding and curing for minimum 3 (three) days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days curing etc. all completed by contractor and accepted by the Engineer-in-charge. | sqm | 1116 | 1111 | 1088 | 1088 |
| 2095. | 30.15 | 112 mm thick partition wall with sand cement hollow block wall (SCHB) having compressive strength of not less than 10 MPa, size (390 x 190 x 112) mm, thickness of individual Block shell should not be less than 25 mm, water absorption not more than 7%, laying with specified mortar (with admixture) of cement and sand in a ratio of not less than 1:5 (sand not less than F.M = 1.2), filling the interstices with mortar and making bond with connecting walls including necessary scaffolding and curing for minimun 14 days on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 7 days including cost of water, electricity and other charges etc. in all completed by the contractor and accepted by the Engineer-in-charge. | |||||
| 2096. | 30.15.1 | Ground Floor | sqm | 862 | 857 | 834 | 834 |
| 2097. | 30.15.2 | Add for each additional floor above ground floor | sqm | 36 | 36 | 36 | 36 |
| 2098. | 30.16 | Minimum 10 mm thick cement plaster in cement : sand = 1:5 in surface of external/internal wall with specified external/internal plaster mix applied in two coats (first coat 6 mm and second coat 4 mm), finishing the corner and edge including washing of sand, cleaning the surface, scaffolding and curing for minimun 3 (three) days on mortar joints by jute/brush in wet, followed by impervious/wet covering for another 4 (four) days etc. all complete etc. all complete and accepted by the Engineer-in-charge. (Rate is excluding the cost of grouting and reinforcement) | |||||
| 2099. | 30.16.1 | Ground floor | sqm | 287 | 283 | 266 | 266 |
| 2100. | 30.16.2 | Add for each additional floor above ground floor | sqm | 6 | 6 | 6 | 6 |