List of Long Schedules
SL# Item Code Item Description Unit Rate for ZoneA
Dhaka & Mymensingh Division
Rate for ZoneB
Chattogram & Sylhet Division
Rate for ZoneC
Rajshahi & Rangpur Division
Rate for ZoneD
Khulna & Barishal Division
DIVISION 07 : REINFORCED CEMENT CONCRETE (RCC) WORKS
411. 07.6.1 For column, wall, beam, slab, drop wall, cornice etc. up to ground floor cum 17389 17584 16575 16208
412. 07.7.1 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum f'cr = 33.5 MPa, satisfying a specified compressive strength f’c = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 385 kg/ cum), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 14992 15210 14290 13923
413. 07.7.2 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum f'cr = 40.5 MPa, satisfying a specified compressive strength f’c =32 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturer's Guideline) making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 445 kg/ cum), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity,cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 15372 15582 14695 14341
414. 07.7.3 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum f'cr = 50 MPa, satisfying a specified compressive strength f’c =40 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 500 kg/ cum), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 15650 15851 15003 14665
415. 07.7.4 Reinforced cement concrete works from batch mix/machine mix with minimum cement content relates to approved mix ratio having minimum f'cr = 60 MPa, satisfying a specified compressive strength f’c =50 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494 (Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content (minimum 500 kg/ cum) and micro silica (minimum 25 kg/ cum) as per approved design mix, including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 18111 18312 17464 17126
416. 07.8.1 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 33.5 MPa, satisfying a specified compressive strength f’c = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in apppendix), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturer's Guideline) making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 385 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 14267 14486 13566 13199
417. 07.8.2 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 40.5 MPa, satisfying a specified compressive strength f’c = 32 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 445 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 14647 14858 13971 13617
418. 07.8.3 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 50 MPa, satisfying a specified compressive strength f’c = 40 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturer's Guideline) making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 500 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 14926 15127 14279 13941
419. 07.8.4 Reinforced cement concrete works from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 60 MPa, satisfying a specified compressive strength f’c = 50 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I,best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content (minimum 500 kg/ cum) and micro silica (minimum 25 kg/ cum) as per approved design mix, carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation to 4th floor) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 17387 17588 16740 16402
420. 07.8.5 Reinforced cement concrete works for thick mat foundation from Ready-Mix concrete with minimum cement content relates to approved mix ratio having minimum f'cr = 33.5 MPa, satisfying a specified compressive strength f’c = 25 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM,Cement conforming to CEM-II/B-M 42.5N (42.5MPa), best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down wellgraded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), High-range water reducing chemical admixture Type-G under ASTM C494(Doses to be applied as per Manufacturer's Guideline), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; using machine batched and machine mixed concrete using cement content as per approved design mix (minimum 400 kg/ cum), carrying to the site of laying using Transit Mixer (considering setting time of concrete from plant to the site), including pumping of concrete using line pump or boom placer to site of laying, maintaining allowable slump of 100mm to150mm (measured at site), casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity,cost of all materials and other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (Foundation: MAT) Note: The mix design shall be done from PWD testing laboratory or other recognized laboratories and be consulted with concerned design office. cum 14234 14448 13548 13189
Help