| SL# | Item Code | Item Description | Unit |
Rate for ZoneA Dhaka & Mymensingh Division |
Rate for ZoneB Chattogram & Sylhet Division |
Rate for ZoneC Rajshahi & Rangpur Division |
Rate for ZoneD Khulna & Barishal Division |
|---|---|---|---|---|---|---|---|
| DIVISION 07 : REINFORCED CEMENT CONCRETE (RCC) WORKS | |||||||
| 401. | 07.3.4 | Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor | cum | 14568 | 14767 | 13773 | 13406 |
| 402. | 07.4 | Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.25:2.5 having minimum f'cr = 40.5 MPa, satisfying a specified compressive strength f’c = 32 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa)/ ASTM-C 150 Type – I, and adding approved high range water reducing admixture of complying specific type (generally be Type-G) under ASTM-C 494, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M. 2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), including conducting necessary tests, screening sand through proper sieves, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper and fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Doses of admixture to be fixed in consultation with design office) (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). | |||||
| 403. | 07.4.1 | Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level | cum | 14147 | 14349 | 13428 | 13074 |
| 404. | 07.4.2 | Padestal, column, column capital, lift wall and RCC wall up to ground floor | cum | 14508 | 14705 | 13764 | 13410 |
| 405. | 07.4.3 | Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to ground floor | cum | 14291 | 14491 | 13563 | 13209 |
| 406. | 07.4.4 | Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor | cum | 14869 | 15060 | 14099 | 13745 |
| 407. | 07.5 | Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1:2 having minimum f'cr = 50 Mpa, satisfying a specified compressive strength f’c = 40 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, and adding approved high range water reducing admixture of complying specific type (generally be Type-G) under ASTM-C 494, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M. 2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), conducting necessary tests, making and placing shutter in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer machine with hopper and fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete approved and accepted by the Engineer-in-charge. (Doses of admixture to be fixed in consultation with design office) (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering) | |||||
| 408. | 07.5.1 | Individual & combined footing, pile cap, raft/mat and foundation beam up to plinth level | cum | 14628 | 14819 | 13942 | 13606 |
| 409. | 07.5.2 | Pedestal, column, column capital, lift wall and RCC wall upto ground floor | cum | 14989 | 15175 | 14278 | 13941 |
| 410. | 07.6 | Cast-in-place fair-faced concrete works with f'cr=33.5 Mpa and f'c=25 Mpa at 28 days on standard cylinders by using 75% of OPC and 25% of white cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2, 20 mm down and well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification) at mix ratio of 1:1.5:3, adding coloring pigment admixture (satisfying ASTM C979) as per architectural design, conforming to the standard practice of code ACI/BNBC/ASTM including conducting necessary tests, screening sand and chips through proper sieves, washing, making and placing shutter in position maintaining true to plumb, making shutter water tight properly, placing reinforcement in position, including pouring of concrete in form, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering) | |||||