DIVISION 07 : REINFORCED CEMENT CONCRETE (RCC) WORKS
371. 07.19.3 Floor and roof slab up to ground floor sqm 24 24 24 24
372. 07.2 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having minimum f'cr = 30.5 MPa, satisfying a specified compressive strength f'c = 22 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33 (Aggregate grading as per table shown in technical specification), conducting necessary tests, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity,other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering)
373. 07.2.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum 13508 13728 12732 12347
374. 07.2.2 Pedestals, column, column capital, lift wall and RCC wall up to ground floor cum 13869 14084 13067 12682
375. 07.2.3 Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to ground floor cum 13652 13871 12866 12481
376. 07.2.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum 14230 14440 13403 13018
377. 07.20 Added Rate of formwork in case of floor slab casting in every 10 days (applicable for buildings with number of floor Fifteen and above) *** {with prior approval from competent authority}
378. 07.20.1 Pedestal, column, column capital, lift wall and wall up to Ground floor (shutter releasing agent shall be used) sqm 48 48 48 48
379. 07.20.2 T-beam, L-beam and rectangular beam etc up to ground floor (shutter releasing agent shall be used) sqm 66 66 66 66
380. 07.20.3 Floor and roof slab up to ground floor sqm 62 62 62 62