List of Long Schedules
SL# Item Code Item Description Unit Rate for ZoneA
Dhaka & Mymensingh Division
Rate for ZoneB
Chattogram & Sylhet Division
Rate for ZoneC
Rajshahi & Rangpur Division
Rate for ZoneD
Khulna & Barishal Division
DIVISION 07 : REINFORCED CEMENT CONCRETE (RCC) WORKS
361. 07.18.3 Padestals, column, wall sqm 526 525 508 508
362. 07.18.4 Tie beam & lintels sqm 521 520 502 502
363. 07.18.5 T-beam, L-beam and rectangular beam sqm 508 507 490 490
364. 07.18.6 Floor & roof slab sqm 561 557 552 552
365. 07.18.7 Cornice, railing, drop wall, louver, fins etc. sqm 459 458 445 445
366. 07.18.8 Sunshade, false ceiling sqm 471 471 459 459
367. 07.18.9 Stair case slab and steps sqm 457 457 445 445
368. 07.19 Added Rate of formwork in case floor slab casting in every 15 days (applicable for buildings with number of floor six and above) *** {with prior approval from competent authority}
369. 07.19.1 Pedestal, column, column capital, lift wall and wall up to Ground floor (shutter releasing agent shall be used) sqm 24 24 24 24
370. 07.19.2 T-beam, L-beam and rectangular beam etc up to ground floor (shutter releasing agent shall be used) sqm 24 24 24 24