| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 3.EQUIPMENT, TOOLS & PLANTS, VEHICLE, SCAFFOLDING ETC. | ||||||
| 131-Aggregate bowl | each | 500 | 500 | 500 | 500 | Edit |
| 132-Multiplug | each | 500 | 500 | 500 | 500 | Edit |
| 133-Slump Mold with base plate, Metal body | each | 2100 | 2100 | 2100 | 2100 | Edit |
| 134-16mm tamping rod, 600mm long | each | 200 | 200 | 200 | 200 | Edit |
| 135-Measurment tape (30 m length) | each | 300 | 300 | 300 | 300 | Edit |
| 136-Measurment tape (6 m length) | each | 120 | 120 | 120 | 120 | Edit |
| 137-Steel Tape (6 m length) | each | 90 | 90 | 90 | 90 | Edit |
| 138-Moisture meter | each | 3500 | 3500 | 3500 | 3500 | Edit |
| 139-Distance meter | each | 1200 | 1200 | 1200 | 1200 | Edit |
| 4.WORK RATE EXCLUDING COST OF MATERIALS | ||||||
| 140-Breaking of 50 mm down brick chips | per % cft | 870 | 870 | 860 | 860 | Edit |