| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 4.WORK RATE EXCLUDING COST OF MATERIALS | ||||||
| 151-Load testing result sheet preparation | per test | 6500 | 6500 | 6500 | 6500 | Edit |
| 152-Carrying cost of timber | per cft | 48 | 48 | 48 | 48 | Edit |
| 153-Seasoning of timber in plant | per cft | 165 | 165 | 165 | 165 | Edit |
| 154-Carrying cost of steel door and window | each | 77 | 77 | 77 | 77 | Edit |
| 155-Fabrication and erection of mild steel truss | per 50 kg | 2550 | 2550 | 2550 | 2550 | Edit |
| 156-Fitting and fxing of safety net framing system | per sft | 30 | 30 | 30 | 30 | Edit |
| 157-Fabrication of safety net | per kg | 25 | 25 | 25 | 25 | Edit |
| 158-Fabrication of light section steel | per 50 kg | 360 | 360 | 360 | 360 | Edit |
| 5.WORK RATE INCLUDING COST OF MATERIALS | ||||||
| 159-Point welding | per point | 3 | 3 | 3 | 3 | Edit |
| 160-Line welding (at field) | per inch | 5 | 5 | 5 | 5 | Edit |