List of Basic Item

Create New Item



Item Code and Name Unit Rate for Zone-A
Dhaka & Mymensingh Division
Rate for Zone-B
Chattogram & Sylhet Division
Rate for Zone-C
Rajshahi & Rangpur Division
Rate for Zone-D
Khulna & Barishal Division
4.WORK RATE EXCLUDING COST OF MATERIALS
151-Load testing result sheet preparation per test 6500 6500 6500 6500 Edit
152-Carrying cost of timber per cft 48 48 48 48 Edit
153-Seasoning of timber in plant per cft 165 165 165 165 Edit
154-Carrying cost of steel door and window each 77 77 77 77 Edit
155-Fabrication and erection of mild steel truss per 50 kg 2550 2550 2550 2550 Edit
156-Fitting and fxing of safety net framing system per sft 30 30 30 30 Edit
157-Fabrication of safety net per kg 25 25 25 25 Edit
158-Fabrication of light section steel per 50 kg 360 360 360 360 Edit
5.WORK RATE INCLUDING COST OF MATERIALS
159-Point welding per point 3 3 3 3 Edit
160-Line welding (at field) per inch 5 5 5 5 Edit