| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 4.WORK RATE EXCLUDING COST OF MATERIALS | ||||||
| 141-Breaking of 20 mm down brick chips | per % cft | 970 | 970 | 960 | 960 | Edit |
| 142-Breaking of 12 mm (1/2") down brick chips | per % cft | 1220 | 1220 | 1210 | 1210 | Edit |
| 143-Breaking of 20 mm down stone chips | per % cft | 2200 | 2200 | 2180 | 2180 | Edit |
| 144-Breaking of 12 mm down stone chips | per % cft | 2400 | 2400 | 2380 | 2380 | Edit |
| 145-Placing and removing of shutter for formwork | per sft | 18 | 18 | 18 | 18 | Edit |
| 146-Making steel shutter for formwork | per sft | 90 | 90 | 90 | 90 | Edit |
| 147-Making steel door-window frame and shutter | per sft | 78 | 78 | 78 | 78 | Edit |
| 148-Making fixed steel glazed frame | per sft | 66 | 66 | 66 | 66 | Edit |
| 149-Making steel grill | per sft | 51 | 51 | 51 | 51 | Edit |
| 150-Filling and stitching gunny bags | per bag | 12 | 12 | 12 | 12 | Edit |