| 4541. |
Schedule of Rate-2021
|
9892
|
For 2nd & additional tests at same site for same testing set (considering 10% reduced cost for empty gunny bags, local sand as loading materials, labour for filling, stitching, loading and unloading etc.
|
404671.5
|
0
|
0
|
0
|
Edit
|
| 4542. |
Schedule of Rate-2021
|
98102
|
For 2nd & additional tests at same site for same testing set (considering 10% reduced cost for empty gunny bags, local sand as loading materials, labour for filling, stitching, loading and unloading etc.
|
457444.8
|
0
|
0
|
0
|
Edit
|
| 4543. |
Schedule of Rate-2021
|
1881
|
From 4m up to 6 m
|
132
|
132
|
132
|
132
|
Edit
|
| 4544. |
Schedule of Rate-2021
|
1882
|
Beyond 6m to above height
|
264
|
264
|
264
|
264
|
Edit
|
| 4545. |
Schedule of Rate-2021
|
18101
|
Above 20m and upto 30m height
|
132
|
132
|
132
|
132
|
Edit
|
| 4546. |
Schedule of Rate-2021
|
18102
|
Beyond 30m height
|
264
|
264
|
264
|
264
|
Edit
|
| 4547. |
Schedule of Rate-2021
|
28122
|
Reduction cost per unit below 40 unit connection
|
10000
|
10000
|
10000
|
10000
|
Edit
|
| 4548. |
Schedule of Rate-2021
|
27412
|
Development using 2 test tube-wells
|
8835
|
8835
|
8835
|
8835
|
Edit
|
| 4549. |
Schedule of Rate-2021
|
27413
|
Development using 3 test tube-wells
|
8835
|
8835
|
8835
|
8835
|
Edit
|
| 4550. |
Schedule of Rate-2021
|
27421
|
Extra cost for test tube-well beyond 200 m depth : For 1 test tube-wells
|
44.17
|
44.17
|
44.17
|
44.17
|
Edit
|