List of Long Schedules
SL# Item Code Item Description Unit Rate for ZoneA
Dhaka & Mymensingh Division
Rate for ZoneB
Chattogram & Sylhet Division
Rate for ZoneC
Rajshahi & Rangpur Division
Rate for ZoneD
Khulna & Barishal Division
DIVISION 26 : SANITARY & WATER SUPPLY WORKS
1521. Supplying, fitting and fixing of G.I. pipe with all special fittings, such as bends, elbows, sockets, reducing sockets, Tee, unions, jam-nuts etc. including cutting trenches where necessary and fitting the same with earth duly rammed and fixing in walls with holder bats and making hole in floors, walls and consequent mending good the damages etc. all complete in all respects approved and accepted by the Engineer- in- charge.
1522. Water in outlet must conform the following indicators and levels:
1523. A. 1) pH- 6.5 to 8.5, 2) Iron as Fe ≤0.3 mg/l, 3) Arsenic≤0.05mg/l, 4) Total Hardness as CaCO3 - 5 - 25 mg/l, 5) Chloride as CL- 500 mg/l, 6) Sulfate as SO42-≤2000mg/l, 7) Alkali equivalent sodium oxide ≤1500 mg/l, 8) Sugars ≤100mg/l, 9)Phosphates as P2O5 ≤100mg/l, 10)Nitrates as NO3-≤500mg/, 11) Lead asPb+ ≤100mg/, 12) Zinc as Zn2+ ≤100 mg/l, 13) Salinity≤1000ppm/l,
1524. B. Setting time and strength test: The initial setting time obtained on paste samples made with the water shall not be less than 1 hr and not differ by more than 25% from the initial setting time obtained on specimens made with distilled or de-ionized water. The final setting time obtained on paste samples made with the water shall not be less than 10 hr and not differ by more than 25% from the final setting time obtained on specimens made with distilled or de-ionized water. The mean compressive strength at 7 days and 28 days of the concrete or mortar specimens prepared with water shall be at least 90% of the mean compressive strength of corresponding specimens prepared with distilled or de-ionized water.
1525. C. To determine the value of aforementioned indicators, test shall be carried out following ISO 29581-1, ISO 7890-1, BDS ISO 12439:2011 (ISO 12439:2010).
1526. D. Supplier shall be responsible for all kind of maintenance and providing spare parts untill the completion of service.
1527. E. The authority or engineer in charge reserves the right to select the materials/goods/ machineries to be used in the plant
1528. Supplying and fitting-fixing stainless steel hand / push shower for ablution including holder etc. all complete approved and accepted by the Engineer- in- charge.
1529. 26.01.1 Approx. 670~690 X 360~ 362 mm size, minimum 27.5 kg of weight; Equivalent to Stella:Victoria /Stella: Imola / RAK: Amy / RAK: Karla or similar brand each 8952 8920 8843 8843
1530. 26.01.2 Approx. 665~ 704 X 360~ 390 mm size, minimum 31.00 kg of weight : Equivalent to CHARU :CM18/ CHARU: CM15 / Stella :Marcela / RAK :Tampa / Stella: Marcela or similar brand each 10455 10423 10346 10346
Help