| SL# | Item Code | Item Description | Unit |
Rate for ZoneA Dhaka & Mymensingh Division |
Rate for ZoneB Chattogram & Sylhet Division |
Rate for ZoneC Rajshahi & Rangpur Division |
Rate for ZoneD Khulna & Barishal Division |
|---|---|---|---|---|---|---|---|
| DIVISION 01 : GENERAL, SITE FACILITIES & SAFETY | |||||||
| 11. | 01.11.1 | 6th to 9th floor, hoisting speed 40 m/min | per month | 17730 | 19061 | 19061 | 19061 |
| 12. | 01.11.2 | 10th to 14th floor, hoisting speed 40 m/min | per month | 21470 | 23609 | 23609 | 23609 |
| 13. | 01.11.3 | 15th to 19th floor, hoisting speed 50 m/min | per month | 25153 | 28149 | 28149 | 28149 |
| 14. | 01.11.4 | 20th to 24th floor, hoisting speed 60 m/min | per month | 29151 | 33034 | 33034 | 33034 |
| 15. | 01.11.5 | 25th to 29th floor, hoisting speed 60 m/min | per month | 32419 | 37212 | 37212 | 37212 |
| 16. | 01.12 | Providing junior architect / project architect having minimum qualification Bachelor in Architecture with registration in respective professional body for detail documentation of architectural themes, drawings, workingout shop drawings, communication with theme architect & getting approval, specifying architectural needs according to approved master architectural themes & plan, certifying as built drawing for the approval etc. and any relevant jobs assigned by the HOPE or his official at site (payment for the item subject to submission of CV & approved by concerned circle Superintending Engineer & duration is initial contract period or contract completion time whichver is less). | per month | 50000 | 50000 | 50000 | 50000 |
| 17. | 01.13 | Providing junior engineer/project engineer having minimum qualification B.Sc. in Civil Engineering with registration in respective professional body for project documentation, progress study & adjustment, preparation of project material schedule and testing schedule for approval etc. & jobs assigned by the HOPE or his official, at site (payment for the item subject to submission of CV & approved by concerned circle Superintending Engineer & duration is initial contract period or contract completion time whichver is less). | per month | 50000 | 50000 | 50000 | 50000 |
| 18. | 01.14 | Supplying, fitting, fixing, operation & maintenance of minimum 5 ton tower crane including hook height maximum 45 m which can be extended upto 120 m by added no of mast. Minimum job radius is 50m. Maximum load capacity 5 ton near centre & 1 ton @ tip at 50 m. Crane structure & foundation should be safe enough to sustain against wind pressure & other loads. Crane Operation & maintenance include trained operator, helper, additional labour for materials placing & removing with necessary connections for electricity supply and dismantling the same after completion of building construction. (The contractor must submit detail structural drawing of supporting frame with foundation and tower crane specification prior to supply on site. All complete, approved & accepted by the Engineer-in-charge. Duration is initial contract period or contract completion time whichever is less .This item is mainly used for contruction material lifting in site. If this item is used in Engineer's Estimate, added charge for lifting construction material in different chapter of SoR must not be considered in Engineer's Estimate.) | |||||
| 19. | 01.14.1 | Height upto 45m | per month | 242881.8 | 242145.59 | 239200.72 | 239200.72 |
| 20. | 01.14.2 | Added rate for height increment every 3m after initial 45m | per month | 8333.33 | 8333.33 | 8333.33 | 8333.33 |