Item Code and Name Unit Rate for Zone-A
Dhaka & Mymensingh Division
Rate for Zone-B
Chattogram & Sylhet Division
Rate for Zone-C
Rajshahi & Rangpur Division
Rate for Zone-D
Khulna & Barishal Division
103.SECONDARY INPUTS
3-Foundation beam (Steel) per sqm 401.39 401.39 401.39 401.39 Edit
3-(1:2:4) with BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion) % cft 18356 18356 18356 18356 Edit
3-Laying concrete (800 cft per day using one mixture machine) % cft 2499.38 2499.38 2499.38 2499.38 Edit
4-Laying concrete (600 cft per day using one mixture machine) % cft 3332.5 3332.5 3332.5 3332.5 Edit
4-(1:2:4) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 % cft 29504.78 29504.78 29504.78 29504.78 Edit
4-Pedestal / column etc. (Steel) per sqm 425.07 425.07 425.07 425.07 Edit
4-Pedestal / column etc. (Wooden) per sqm 428.51 428.51 428.51 428.51 Edit
4-25 mm thick patent stone (1:1.5:3) with stone/chips for mosaic work % sft 3231.29 3231.29 3231.29 3231.29 Edit
5-38 mm thick artificial patent stone flooring (1:2:4) with brick chips % sft 4511.63 4511.63 4511.63 4511.63 Edit
5-Tie-beam, lintels (Wooden) per sqm 424.32 424.32 424.32 424.32 Edit