| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 103.SECONDARY INPUTS | ||||||
| 10-Cost for laying glazed tiles on floor with adhesives | % sft | 4681.88 | 4681.88 | 4681.88 | 4681.88 | Edit |
| 11-Cost for laying glazed tiles on floor (1:3) | % sft | 6997.47 | 6997.47 | 6997.47 | 6997.47 | Edit |
| 11-Stair-case slab (Wooden) | per sqm | 372.33 | 372.33 | 372.33 | 372.33 | Edit |
| 11-Stair-case slab (Steel) | per sqm | 448.97 | 448.97 | 448.97 | 448.97 | Edit |
| 12-1/2 " thick plaster (1:4) | sft | 23.22 | 23.22 | 23.22 | 23.22 | Edit |
| 13-1/2 " thick plaster (1:4) with N.C.F. | sft | 28.39 | 28.39 | 28.39 | 28.39 | Edit |
| 14-One layer brick-flat soling | % sft | 36.19 | 36.19 | 36.19 | 36.19 | Edit |
| 15-Polythene sheet laying | % sft | 354.72 | 354.72 | 354.72 | 354.72 | Edit |
| 16-Brick work (1:6) in superstructure | % cft | 18884.75 | 18884.75 | 18884.75 | 18884.75 | Edit |
| 17-Brick work (1:6) in foundation | % cft | 17397.25 | 17397.25 | 17397.25 | 17397.25 | Edit |