Item Code and Name Unit Rate for Zone-A
Dhaka & Mymensingh Division
Rate for Zone-B
Chattogram & Sylhet Division
Rate for Zone-C
Rajshahi & Rangpur Division
Rate for Zone-D
Khulna & Barishal Division
103.SECONDARY INPUTS
7-(1:1.25:2.5) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 % cft 30980.2 30980.2 30980.2 30980.2 Edit
8-(1:1:2) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 % cft 32090.44 32090.44 32090.44 32090.44 Edit
8-Waffel / ribbed slab (Steel) per sqm 586.75 586.75 586.75 586.75 Edit
8-Waffel / ribbed slab (Wooden) per sqm 539.6 539.6 539.6 539.6 Edit
8-Cost for laying glazed tiles on wall (1:3) % sft 5059.97 5059.97 5059.97 5059.97 Edit
9-Cost for laying glazed tiles on floor (1:4) % sft 4404.7 4404.7 4404.7 4404.7 Edit
9-Railing-drop-walls, cornice, fins etc. (Wooden) per sqm 374.05 374.05 374.05 374.05 Edit
9-Railing-drop-walls, cornice, fins etc. (Steel) per sqm 396.65 396.65 396.65 396.65 Edit
10-Sun-shade (Steel) per sqm 440.25 440.25 440.25 440.25 Edit
10-Sun-shade (Wooden) per sqm 383.52 383.52 383.52 383.52 Edit