| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 103.SECONDARY INPUTS | ||||||
| 7-(1:1.25:2.5) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 | % cft | 30980.2 | 30980.2 | 30980.2 | 30980.2 | Edit |
| 8-(1:1:2) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 | % cft | 32090.44 | 32090.44 | 32090.44 | 32090.44 | Edit |
| 8-Waffel / ribbed slab (Steel) | per sqm | 586.75 | 586.75 | 586.75 | 586.75 | Edit |
| 8-Waffel / ribbed slab (Wooden) | per sqm | 539.6 | 539.6 | 539.6 | 539.6 | Edit |
| 8-Cost for laying glazed tiles on wall (1:3) | % sft | 5059.97 | 5059.97 | 5059.97 | 5059.97 | Edit |
| 9-Cost for laying glazed tiles on floor (1:4) | % sft | 4404.7 | 4404.7 | 4404.7 | 4404.7 | Edit |
| 9-Railing-drop-walls, cornice, fins etc. (Wooden) | per sqm | 374.05 | 374.05 | 374.05 | 374.05 | Edit |
| 9-Railing-drop-walls, cornice, fins etc. (Steel) | per sqm | 396.65 | 396.65 | 396.65 | 396.65 | Edit |
| 10-Sun-shade (Steel) | per sqm | 440.25 | 440.25 | 440.25 | 440.25 | Edit |
| 10-Sun-shade (Wooden) | per sqm | 383.52 | 383.52 | 383.52 | 383.52 | Edit |