| Item Code and Name | Unit |
Rate for Zone-A Dhaka & Mymensingh Division |
Rate for Zone-B Chattogram & Sylhet Division |
Rate for Zone-C Rajshahi & Rangpur Division |
Rate for Zone-D Khulna & Barishal Division |
|
|---|---|---|---|---|---|---|
| 103.SECONDARY INPUTS | ||||||
| 5-Tie-beam, lintels (Steel) | per sqm | 442.08 | 442.08 | 442.08 | 442.08 | Edit |
| 5-(1:1.5:3) with BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion) | % cft | 17808.2 | 17808.2 | 17808.2 | 17808.2 | Edit |
| 5-Laying concrete (500 cft per day using one mixture machine) | % cft | 3999 | 3999 | 3999 | 3999 | Edit |
| 6-(1:1.5:3) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2 | % cft | 30285.02 | 30285.02 | 30285.02 | 30285.02 | Edit |
| 6-T-L-R beam (Steel) | per sqm | 467.7 | 467.7 | 467.7 | 467.7 | Edit |
| 6-T-L-R beam (Wooden) | per sqm | 413.55 | 413.55 | 413.55 | 413.55 | Edit |
| 6-Labour cost of mosaic with glass strip | % sft | 6012.5 | 6012.5 | 6012.5 | 6012.5 | Edit |
| 7-Labour cost of mosaic without glass strip | % sft | 5075 | 5075 | 5075 | 5075 | Edit |
| 7-Floor/Roof slab (Wooden) | per sqm | 457.04 | 457.04 | 457.04 | 457.04 | Edit |
| 7-Floor/Roof slab (Steel) | per sqm | 486.1 | 486.1 | 486.1 | 486.1 | Edit |