| 4431. |
Schedule of Rate-2021
|
13
|
1/2 " thick plaster (1:4) with N.C.F.
|
28.39
|
28.39
|
28.39
|
28.39
|
Edit
|
| 4432. |
Schedule of Rate-2021
|
14
|
One layer brick-flat soling
|
36.19
|
36.19
|
36.19
|
36.19
|
Edit
|
| 4433. |
Schedule of Rate-2021
|
15
|
Polythene sheet laying
|
354.72
|
354.72
|
354.72
|
354.72
|
Edit
|
| 4434. |
Schedule of Rate-2021
|
16
|
Brick work (1:6) in superstructure
|
18884.75
|
18884.75
|
18884.75
|
18884.75
|
Edit
|
| 4435. |
Schedule of Rate-2021
|
17
|
Brick work (1:6) in foundation
|
17397.25
|
17397.25
|
17397.25
|
17397.25
|
Edit
|
| 4436. |
Schedule of Rate-2021
|
18
|
Plain concrete (1:3:6) with brick chips
|
17561.67
|
17561.67
|
17561.67
|
17561.67
|
Edit
|
| 4437. |
Schedule of Rate-2021
|
19
|
Plain concrete (1:2:4) with brick chips
|
20151.67
|
20151.67
|
20151.67
|
20151.67
|
Edit
|
| 4438. |
Schedule of Rate-2021
|
20
|
Plain concrete (1:1.5:3) with brick chips
|
20327.8
|
20327.8
|
20327.8
|
20327.8
|
Edit
|
| 4439. |
Schedule of Rate-2021
|
21
|
Concrete for slab (1:2:4)
|
20355.5
|
20355.5
|
20355.5
|
20355.5
|
Edit
|
| 4440. |
Schedule of Rate-2021
|
22
|
Concrete for wall (1:2:4)
|
20855.38
|
20855.38
|
20855.38
|
20855.38
|
Edit
|