| 4461. |
Schedule of Rate-2021
|
3
|
Foundation beam (Steel)
|
401.39
|
401.39
|
401.39
|
401.39
|
Edit
|
| 4462. |
Schedule of Rate-2021
|
4
|
Pedestal / column etc. (Steel)
|
425.07
|
425.07
|
425.07
|
425.07
|
Edit
|
| 4463. |
Schedule of Rate-2021
|
5
|
Tie-beam, lintels (Steel)
|
442.08
|
442.08
|
442.08
|
442.08
|
Edit
|
| 4464. |
Schedule of Rate-2021
|
6
|
T-L-R beam (Steel)
|
467.7
|
467.7
|
467.7
|
467.7
|
Edit
|
| 4465. |
Schedule of Rate-2021
|
7
|
Floor/Roof slab (Steel)
|
486.1
|
486.1
|
486.1
|
486.1
|
Edit
|
| 4466. |
Schedule of Rate-2021
|
8
|
Waffel / ribbed slab (Steel)
|
586.75
|
586.75
|
586.75
|
586.75
|
Edit
|
| 4467. |
Schedule of Rate-2021
|
9
|
Railing-drop-walls, cornice, fins etc. (Steel)
|
396.65
|
396.65
|
396.65
|
396.65
|
Edit
|
| 4468. |
Schedule of Rate-2021
|
10
|
Sun-shade (Steel)
|
440.25
|
440.25
|
440.25
|
440.25
|
Edit
|
| 4469. |
Schedule of Rate-2021
|
11
|
Stair-case slab (Steel)
|
448.97
|
448.97
|
448.97
|
448.97
|
Edit
|
| 4470. |
Schedule of Rate-2021
|
1
|
Laying concrete (1200 cft per day using one mixture machine)
|
1666.25
|
1666.25
|
1666.25
|
1666.25
|
Edit
|