Schedule of Rate-2021
|
23
|
5" / 125 mm brickwork (1:4)
|
8986.75
|
8986.75
|
8986.75
|
8986.75
|
Edit
|
| 4442. |
Schedule of Rate-2021
|
24
|
5" / 125 mm brickwork (1:6)
|
8794.75
|
8794.75
|
8794.75
|
8794.75
|
Edit
|
| 4443. |
Schedule of Rate-2021
|
25
|
Earthwork in excavation
|
4979.17
|
4979.17
|
4979.17
|
4979.17
|
Edit
|
| 4444. |
Schedule of Rate-2021
|
26
|
Synthetic Enamel paint
|
1795.26
|
1795.26
|
1795.26
|
1795.26
|
Edit
|
| 4445. |
Schedule of Rate-2021
|
27
|
French polish
|
3424.15
|
3424.15
|
3424.15
|
3424.15
|
Edit
|
| 4446. |
Schedule of Rate-2021
|
28
|
Sand fill (0.8)
|
2692.67
|
2692.67
|
2692.67
|
2692.67
|
Edit
|
| 4447. |
Schedule of Rate-2021
|
29
|
40 Grade rebar in concrete
|
673.92
|
673.92
|
673.92
|
673.92
|
Edit
|
| 4448. |
Schedule of Rate-2021
|
1
|
Colum footing (Wooden)
|
425.82
|
425.82
|
425.82
|
425.82
|
Edit
|
| 4449. |
Schedule of Rate-2021
|
2
|
Raft / mat (Wooden)
|
403.11
|
403.11
|
403.11
|
403.11
|
Edit
|
| 4450. |
Schedule of Rate-2021
|
3
|
Foundation beam (Wooden)
|
386.97
|
386.97
|
386.97
|
386.97
|
Edit
|