| 4471. |
Schedule of Rate-2021
|
2
|
Laying concrete (1000 cft per day using one mixture machine)
|
1999.5
|
1999.5
|
1999.5
|
1999.5
|
Edit
|
| 4472. |
Schedule of Rate-2021
|
3
|
Laying concrete (800 cft per day using one mixture machine)
|
2499.38
|
2499.38
|
2499.38
|
2499.38
|
Edit
|
| 4473. |
Schedule of Rate-2021
|
4
|
Laying concrete (600 cft per day using one mixture machine)
|
3332.5
|
3332.5
|
3332.5
|
3332.5
|
Edit
|
| 4474. |
Schedule of Rate-2021
|
5
|
Laying concrete (500 cft per day using one mixture machine)
|
3999
|
3999
|
3999
|
3999
|
Edit
|
| 4475. |
Schedule of Rate-2021
|
1
|
(1:3:6) with BRICK CHIPS and sand of F.M. 1.2
|
14983
|
14983
|
14983
|
14983
|
Edit
|
| 4476. |
Schedule of Rate-2021
|
2
|
(1:2:4) with BRICK CHIPS and sand of F.M. 1.2
|
17573
|
17573
|
17573
|
17573
|
Edit
|
| 4477. |
Schedule of Rate-2021
|
3
|
(1:2:4) with BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion)
|
18356
|
18356
|
18356
|
18356
|
Edit
|
| 4478. |
Schedule of Rate-2021
|
4
|
(1:2:4) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
|
29504.78
|
29504.78
|
29504.78
|
29504.78
|
Edit
|
| 4479. |
Schedule of Rate-2021
|
5
|
(1:1.5:3) with BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion)
|
17808.2
|
17808.2
|
17808.2
|
17808.2
|
Edit
|
| 4480. |
Schedule of Rate-2021
|
6
|
(1:1.5:3) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.2
|
30285.02
|
30285.02
|
30285.02
|
30285.02
|
Edit
|