Long Schedule By Division

SL# Item Code Item Description Unit Rate for ZoneA Rate for ZoneB Rate for ZoneC Rate for ZoneD
DIVISION 03 : BRICK SOLING, CC, DPC ETC.
1. 03.1.1 One layer brick flat soling in foundation or in floor with first class/picked jhama bricks (BDS 208) including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge Show Breakup sqm 478 477 464 456
2. 03.1.2 One layer brick flat soling in foundation or in floor with sand cement solid block (SCSB) (250x115x115)mm including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge Show Breakup sqm 541 540 535 535
3. 03.2.1 One layer Herringbone bond (HBB) brick soling in foundation or in floor with first class/picked jhama bricks (BDS 208) including preparation of bed and filling the interstices with local sand, leveling including supply of water, other charges, costs of tools and plants etc. all complete and accepted by the Engineer-in-charge Show Breakup sqm 756 755 736 723
4. 03.2.2 One layer Herringbone bond (HBB) brick soling in foundation or in floor with sand cement solid block (SCSB) (250x115x115)mm including preparation of bed and filling the interstices with local sand, leveling including supply of water, other charges, costs of tools and plants etc. all complete and accepted by the Engineer-in-charge Show Breakup sqm 544 543 538 538
5. 03.3.1 Brick on end edging with 1st class brick (BDS 208) including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge Show Breakup meter 121 121 118 116
6. 03.3.2 Brick on end edging with Automatic machine made 1st class brick (240x114x70)mm including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge Show Breakup meter 137 136 135 135
7. 03.3.3 Brick on end edging with Sand Cement Solid block (SCSB) (250x115x115)mm including preparation of bed and filling the interstices with local sand, leveling, maintaining alignment and grid etc. all complete and accepted by the Engineer-in-charge Show Breakup meter 142 141 140 140
8. 03.4 Lean / blinding concrete (1:3:6) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by the Engineer-in-charge.(Cement: CEM-II/B-M)
9. 03.4.1 Lean / blinding concrete in foundation (1:3:6) with cement, brick chips and sand of F.M. 1.2 Show Breakup cum 7781 7710 7548 7482
10. 03.4.2 Lean / blinding concrete in floor (1:3:6) with cement, brick chips and sand of F.M. 1.2 Show Breakup cum 7610 7539 7381 7314
11. 03.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/B-M)
12. 03.5.1 Mass concrete in foundation (1:2:4) with brick chips and local sand of F.M. 1.2. Show Breakup cum 8903 8889 8727 8661
13. 03.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2. Show Breakup cum 8732 8718 8560 8493
14. 03.6 Damp proof course (DPC) (1:1.5:3) of cement concrete with cement, sand and picked jhama brick chips or stone chips including breaking of chips, screening, centering, shuttering, casting, curing and finishing with a coat of bitumen including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/B-M)
15. 03.6.1 75 mm thick damp proof course (1:1.5:3) with cement, Sylhet sand (F.M. 2.2) and stone chips. Show Breakup sqm 1459 1454 1396 1382
16. 03.6.2 150 mm thick damp proof course (1:1.5:3) with cement, Sylhet sand (F.M. 2.2), stone chips and water-proofing admixture/agent approved by Engineer-in-charge. Show Breakup cum 15680 15635 15082 14898
17. 03.7 Supplying and laying of single layer polythene sheet weighing one kilogram per 6.5 square meter in floor or any where below cement concrete complete in all respect and accepted by Engineer-in-charge. Show Breakup sqm 47 47 46 46
18. 03.8 Added fixed rate for mass concrete work in any floor above ground floor cum 29 28 26 26