Long Schedule By Division

SL# Item Code Item Description Unit Rate for ZoneA Rate for ZoneB Rate for ZoneC Rate for ZoneD
DIVISION 02 : EXCAVATION, FILLING & SITE DEVELOPMENT AND PALISADING
1. 02.1 Earth work in excavation in all kinds of soil for foundation trenches including layout, providing center lines, local bench-mark pillars, levelling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the Engineer-in-charge, subject to submit method statement of carrying out excavation work to the Engineer-in-charge for approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations under the contract.
2. 02.1.1 Layout and marking for earthwork in excavation in foundation accepted by the Engineer-in-charge. [Plinth area of the structure shall be considered for measurement] Show Breakup sqm 21 21 20 20
3. 02.1.2 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in soft clayey soil / loose sand / silt Show Breakup cum 151 148 138 138
4. 02.1.3 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in medium stiff clayey soil. Show Breakup cum 216 211 196 196
5. 02.1.4 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in very stiff (hard) clayey soil/ rubbish etc. Show Breakup cum 290 283 263 263
6. 02.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of semi-liquid state. Show Breakup cum 336 329 306 306
7. 02.1.6 Added rate for each additional 0.5 meter depth exceeding 1.5 meter. Show Breakup cum 36 35 32 32
8. 02.1.7 Added rate for each 1 m additional lead beyond 10 m. Show Breakup cum 5 5 4 4
9. 02.10.1 Sand filling in foundation trenches and plinth with sand having F.M. 0.5 to 0.8 in 150 mm layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. Show Breakup cum 1167 1169 1114 1114
10. 02.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M. 1.2 in 150 mm in layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. Show Breakup cum 1296 1301 1246 1246
11. 02.10.3 Sand filling in foundation trenches and plinth with sand having min. F.M. 2.2 in 150 mm layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. Show Breakup cum 3257 3315 3176 3142
12. 02.11 50 mm down graded picked jhama khoa consolidation in foundation trenches by mixing the same with best quality local sand (F.M. 1.2) in (2:1) (khoa: sand) proportion to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) including breaking and screening chips, laying and spreading in 150 mm layers uniformly and compacting etc. all complete and accepted by the Engineer-in-charge. Show Breakup cum 5060 5045 4892 4825
13. 02.12 50 mm down graded picked jhama khoa consolidation in foundation trenches by mixing in mixer machine with best quality local sand (F.M. 1.2) and cement in (1:6:12) (cement: sand: khoa) proportion to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) including breaking and screening chips, laying and spreading in150 mm layers uniformly and compacting etc. all complete and accepted by Engineer-in-charge. Show Breakup cum 5810 5776 5645 5579
14. 02.13 Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the building site to achive minimum dry density of 95% with optimum moisture content (Modified proctor test) including carrying watering, leveling, dressing and compacting to a specified percentage each layer up to finished level etc. all complete and accepted by Engineer-in-charge. Show Breakup cum 255 249 232 232
15. 02.14 Cleaning and disposing of excavated earth from the construction site by truck or by any other means to a place within 30 km radius of the city or town area including loading & unloading at both ends, leveling and dressing the carried earth etc. complete and accepted by the Engineer-in-charge. Show Breakup cum 803 798 782 782
16. 02.15 Earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or by any other means including loading and unloading at both ends, leveling, watering and compacting to achive minimum dry density of 95% with optimum moisture content (modified proctor test) including local carriage each layer up to finished level including cost of water and test (carried from beyond 300 m) etc. all complete and accepted by the Engineer-in-charge
17. 02.15.1 For Dhaka metropolitan area. Show Breakup cum 884 880 863 863
18. 02.15.2 For Chattogram / Sylhet metropolitan area and Narayanganj district. Show Breakup cum 810 807 790 790
19. 02.15.3 For Rajshahi / Barisal / Khulna metropolitan area. Show Breakup cum 771 767 750 750
20. 02.15.4 For other than Dhaka, Chattogram, Sylhet, Rajshahi, Barisal, Khulna metropolitan area and Narayanganj district. cum 771 767 750 750
21. 02.16 Site development/Improvement by carted earth or dredged sand, sandy silt (free from any organic, foreign, environmental hazardous substances) carried by head or truck or any other means including cost of cutting or by dredging of sand, sandy silt, all; including local carrying, placing the earth/sand, sandy silt in the designated area, maintaining slopes, breaking lumps, levelling and dressing in layers up to finished level etc. all complete as per direction and accepted by the engineer in charge.
22. 02.16.1 For Dhaka metropolitan area.
23. 02.16.1.1 By other method/means than dredgeing. cum 632 630 618 618
24. 02.16.1.2 By dredging including necessary systems thereof. cum 373 372 369 369
25. 02.16.2 For Chattogram / Sylhet metropolitan area and Narayanganj district.
26. 02.16.2.1 By other method/means than dredgeing. cum 588 587 574 574
27. 02.16.2.2 By dredging including necessary systems thereof. cum 343 342 338 338
28. 02.16.3 For Rajshahi / Barisal / Khulna metropolitan area.
29. 02.16.3.1 By other method/means than dredgeing. cum 588 587 574 574
30. 02.16.3.2 By dredging including necessary systems thereof. cum 319 318 316 316
31. 02.16.4 For other than Dhaka, Chattogram, Sylhet, Rajshahi, Barisal, Khulna metropolitan area and Narayanganj district.
32. 02.16.4.1 By other method/means than dredgeing. cum 588 587 574 574
33. 02.16.4.2 By dredging including necessary systems thereof. cum 318 318 316 316
34. 02.17 Mechanical compaction of earth beyond plinth area, required for pre-approved specific engineering purpose in 150 mm layers including levelling, watering and consolidation each layer with chain dozer, grader, roller etc. to achieve minimum dry density of 95% with optimum moisture content (modified proctor test) up to finished level all complete and accepted by the engineer-in-charge subjected to submission of the method statement. cum 295 291 279 279
35. 02.18 Earthwork in excavation of pond of any dimension in all kinds of soil including cutting up to required depth including bailing out water and throwing on the embankment, breaking clods, ramming and leveling, dressing in 225 mm layer with maintaining the side slopes and level of both pond and the embankment as per design and accepted by the Engineer-in-charge.
36. 02.18.1 For initial lead of 30 m and lift of 1.5 m Show Breakup cum 281 277 257 257
37. 02.18.2 Added for each additional lift of 0.3 m beyond 1.5 m and up to 3 m Show Breakup cum 12 12 11 11
38. 02.18.3 Added for each additional lift of 0.3 m beyond 3 m and up to 4.5 m Show Breakup cum 18 18 16 16
39. 02.18.4 Added for each additional lift of 0.3 m beyond 4.5 m and up to 6 m Show Breakup cum 24 23 22 22
40. 02.18.5 Added for each additional lead of 30 m or part thereof beyond initial lead 30 meter Show Breakup cum 36 35 32 32
41. 02.19.1 Bailing out water by 1 cusec diesel operated pump including hire charge of pump, fuel, operator, spares and maintenance etc. all complete and accepted by by the Engineer-in-charge. Show Breakup per hour 677 670 644 644
42. 02.19.2 Bailing out water by 1 cusec electricity operated pump including hire charge of pump, fuel, operator, spares and maintenance etc. all complete and accepted by the Engineer-in-charge. Show Breakup per hour 562 556 530 530
43. 02.2 Bailing out of trapped water caused by inundation or rain, by pump from foundation trenches. Show Breakup hour 474 474 458 458
44. 02.3 Supplying of straight and strong borrak bamboo posts of having minimum 75 mm diameter althrough and driving the same vertically in the ground up to required depth by any means shaping the top of the post, all complete and accepted by the Engineer-in-charge. Show Breakup meter 90 90 81 81
45. 02.4 Supplying of wooden ballah having an average diameter not less than 150 mm (without barks) at one third distance from larger end with a minimum end diameter of 100 mm for retaining purpose and driving to a depth as per design and drawing by any method including all arrangement for staging, hoisting, carrying etc. complete and accepted by the Engineer-in-charge. Show Breakup meter 747 738 702 702
46. 02.5 Palisading work by supplying of bitumen drum sheet walling tied with 20 BWG G.I. wire fixing the same with already driven borrak bamboo posts with half split borrak bamboo runners @ 450mm c/c horizontally with iron nails, G.I wire etc. all complete and accepted by the Engineer-in-charge. (Rate is excluding the cost of bamboo post). Show Breakup sqm 613 608 583 583
47. 02.6 Supplying and fitting-fixing horizontal bracing in palisading with half split wooden ballah having an average diameter not less than 150 mm with a minimum end diameter of 100 mm @ 450 mm including supply of iron nails, gazals etc. complete approved and accepted by the Engineer-in-charge. Show Breakup meter 226 224 216 216
48. 02.7.1 Shore protection work during excavation in foundation trenches up to 1.5 m depth to protect loss due to damage of property by palisading accepted by the Engineer-in-charge. [The rate is including the cost of vertical post] Show Breakup sqm 712 706 673 673
49. 02.7.2 Shore protection work during excavation in foundation trenches beyond 1.5 m depth to protect loss due to damage of property by palisading accepted by the Engineer-in-charge, [The rate is including the cost of vertical post] Show Breakup sqm 1043 1042 989 989
50. 02.8 Supply of 2 mm thick best quality geo-textile from approved manufacturer/origin and laying as per manufacturer’s instructions approved and accepted by the Engineer-in-charge. Before commencement of laying of geo-textile, the contractor must submit the method statement for carrying out this work including sample with evidence of origin and compliance certificate from independent testing laboratory for approval. Show Breakup sqm 214 212 209 209
51. 02.9 Removing sludge or semi-liquid clay/substances etc not suitable for pumping out or carrying by head load from the bottom of any marshy land, lake, ditch, pond by mixing fine local sand of F.M. 0.8 or less to a proportion such that it can be carried to an intermediate point of disposal and cutting the same including stacking and spreading properly on a suitable place to dry in the sun for a certain days and dispose the dried sludge or clay to a safe distance etc. complete and accepted by Engineer-in-charge subject to submit method statement to the engineer in charge for carrying out the works including ultimate disposal of the sludge under this item for approval. However, engineer’s approval shall not relieve the Contractor of his responsibilities and obligations under the contract. Show Breakup cum 1088 1077 1032 1032