Long Schedule By Division

SL# Item Code Item Description Unit Rate for ZoneA Rate for ZoneB Rate for ZoneC Rate for ZoneD
DIVISION 27 : DEEP TUBE-WELL
1. Boring by using 100 mm dia cutter and 40 mm dia heavy type G.I pipe (wall thickness 2.9 mm, outside diameter min 47.8 mm, weight 3.517 kg/m, capable to withstand 50 kg/cm2 pressure) and other equipments capable of drilling up to a depth of 500 meter by water jet system through all sorts of soil strata providing protection of caving by supplying necessary casing pipe. Collection of soil samples at every 3 meter interval and at every change of soil strata and preserving them in a controlled environment for analysis and laboratory test. Finally, withdrawal of boring and casing pipes etc. complete and accepted by the Engineer-in-charge.
2. "Furnishing design of a production well by testing of water and soil samples from test bores up to 350 m depth collecting samples of water from the best suitable aquifer, filling in sterilized air-tight glass bottles having no air space inside; collecting soil (sand, solids etc) at every 3 m interval and at each change of soil strata from the bores, arranging them in the cell of a box in an orderly manner. Carrying out test of water for (1) pH, (2) CO2 (3) Chloride, (4) Fluoride, (5) Iron, (6) Manganese, (7) Nitrate-Nitrogen, (8)Total alkalinity, (9) Total hardness, (10) Arsenic, (11) Turbidity, followed by test reports along with Bangladesh Standards of potable water and (12) sieve analysis on soils throughout a bore, leading to ascertain the best suitable sustained aquifers, depths and slot sizes of strainer, types and dia of tube well for specific yield, thickness of shrouding around strainer, fineness modulus of shrouding materials, mechanical units (pumps, compressor) for testing and operation of the tube well, maintaining test bore functional till tube well installation, testing etc. is finished, finally filling and sealing the left over test bore permanently, including carrying water and soil samples under direct responsibility of Engineer-in-charge to BRTC, BUET or other reputed laboratory, approved by the authority, submitting the report and design details all complete and accepted by the Engineer-in-charge and maintaining the mobilized tools and plants at site till satisfactory test results are found (if not, next test bore may be executed with the approval of concern S.E. / Design Office)
3. Total No. of test on water: 11 types of test x 1 test bore x one set sample (3 specimen) = 11 Nos. test (each specimen 1.5 liter of water)
4. Sieve analysis: min 9 Nos. Sample x one test x One bore = 9 Nos. test (Samples are of 1 kg dry wt. each)"
5. There are about 55 (fifty-five) tests for potable water quality standard according to Bangladesh Environment Conservation Rules-12 (Schedule-3), 1997, under ECA 1995 of Ministry of Environment and Forest. Therefore, additional test/ tests on water or sieve analysis of soil if required, other than the above specified 12 (twelve) tests, may be carried out for public interest as per direction of the design engineer on actual payment including profit, VAT and all other charges.
6. Disinfections of the well by using minimum 3 kg of bleaching powder of 33% strength or any other disinfectant as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 454 454 454 454
7. PRODUCTION WELL
8. Mobilization: Preparation for installation of tube-well and transportation of complete boring equipments, labour and materials to the work site and remove the materials after completion of the works. Installation of drilling rig and accessories, making arrangements for electricity, water, labour shed, site office and stores, digging mud pit etc, leveling, dressing and clearing of the site as per original condition and a testing for discharge using minimum 1000 liter water tub etc. all complete as per specifications and accepted by the Engineer-in-charge.
9. Preparation and making gravel pack around the tube well fixtures with supply of designed graded pea gravels free from any substance harmful to pipe and health confirmed by test (Passing through #10 mesh and retained on #40 mesh) including sieving, washing etc. complete as per standard specification and accepted by the Engineer-in-charge. (The rate is inclusive of the cost of extra amount required for caving and extra depth below the tube well fixtures, shrouding should not be more than 15 m above the strainer and measurement should be allowed from bottom of the tube-well fixture to top of the gravel pack) Show Breakup cum 5484 5468 4987 4987
10. Making a sanitary seal up to a minimum depth of 6 meter from G.L. or as specified including the supply of approved quality of cement, sand and khoa (12 mm down graded) in a ratio of (1:1:5:3) as per standard specification and accepted by the Engineer-in-charge. Show Breakup cum 9531 9535 9373 9301
11. INSTALLATION OF 50 mm x 125 mm DIA SHROUDED
12. PRODUCTION WELL WITH PVC PIPE
13. Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as per ISO 7686, minimum required strength 25 MPa conforming to BDS-1:2013, 4.4.1, 4.4.2 at working site as per standard practice and accepted by the Engineer-in-charge. Note : Pipe size (Wall Thickness) will be chosen as per table page no: )
14. Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as per specification and accepted by the Engineer-in-charge. Show Breakup per hour 873 871 859 859
15. Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) to obtain chlorinated water having 150 ppm free chlorine in the well complete as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 1644 1644 1644 1644
16. Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or by local clay free from any substances harmful to pipes and health as per standard specification and accepted by the Engineer-in-charge. Show Breakup meter 45 44 41 41
17. Protective top cover: Supplying and fitting fixing of best quality 150 mm dia 4 mm thick MS. Pipe 1.0 m (3'-4") long one end blocked with 200 mm dia 4 mm thick M.S. plate and other end minimum 300 mm (1'-0") embedded in sanitary seal for protection of uPVC Housing Pipe as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 5325 5313 5264 5264
18. INSTALLATION OF 75 mm x 150 mm DIA SHROUDED
19. PRODUCTION WELL WITH PVC PIPE
20. Boring: Execution of 350 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter). Boring for 350 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval or as required and at every change in soil stratum including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from E.G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth or of further boring required due to caving and siltation)
21. Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as per ISO 7686, minimum required strength 25 MPa conforming to BDS-1:2013, 4.4.1, 4.4.2 at working site as per standard practice and accepted by the Engineer-in-charge.
22. Complete installation of 50 mm dia uPVC tube well fixtures such as expanded top or furnishing pipe, reducer, tube well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing with best quality PVC solution, iron screws and PVC tape, sockets and placing in position with proper size M.S. centralizer @ 3.0 meter c/c in strainer portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. Show Breakup meter 105 103 99 99
23. Complete development of the tube well by air compressor and pump of suitable capacity by alternate surging and pumping or any specified method until satisfactory yield is achieved in sand and turbid free water confirmed by laboratory test using necessary quantity of cologne and conducting step drawn-down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding)
24. Note: Tender for test & observation well must be called before hand. Tender for main production well will then be called on the basis of required data obtained from the test well. Requirements of water must be the guiding factor for dimensioning the main well.
25. SINKING OF 38 mm DIA TEST AND OBSERVATION WELL
26. Complete development of the well by suitable air compressor and pump of suitable capacity by alternate surging and pumping untill satisfactory yield, sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding)
27. Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as per specification and accepted by the Engineer. Show Breakup hour 1070 1068 1055 1055
28. Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated water having 150 ppm available free chlorine complete as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 1997 1997 1997 1997
29. Filling of the bore-hole around the tube well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard specification and accepted by the Engineer-in-charge. Show Breakup meter 54 53 50 50
30. Protective top cover: Supplying and fitting fixing best quality 200 mm dia 4 mm thick M.S. pipe 1.0 m (3'-4") long, one end blocked with 250 mm dia 4 mm thick M.S. plate and other end minimum 300 mm (1'-0) embedded in sanitary seal for protection of uPVC housing pipe as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 7147 7129 7055 7055
31. INSTALLATION OF 100 mm x 200 mm DIA SHROUDED
32. PRODUCTION WELL WITH PVC PIPE
33. Boring: Execution of 400 mm dia of boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) Boring for 400 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval or as required and at every change in soil stratum including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from E.G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth or of further boring required due to caving and siltation)
34. Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as per ISO 7686, minimum required strength 25 MPa conforming to BDS-1878:2014, 4.4.1, 4.4.2 at working site as per standard practice and accepted by the Engineer-in-charge.
35. Filling of the borehole around the tube-well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard specification and accepted by the Engineer-in-charge. Show Breakup meter 61 60 56 56
36. Protective top cover: Supplying and fitting fixing best quality 250 mm dia 4 mm thick M.S. pipe, 1.0 m (3'-4") long one, end blocked with 300 mm dia 4 mm thick M.S. plate and other end minimum 300 (1'-0") embedded in sanitary seal for protection of uPVC Housing pipe as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 11741 11711 11588 11588
37. INSTALLATION OF 150 mm x 200 mm & 150 mm x 250 mm DIA SHROUDED
38. PRODUCTION WELL WITH uPVC PIPE
39. Boring: Execution of 600 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter). Boring for 600 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval or as required and at every change in soil stratum including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from E.G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth or of further boring required due to caving and siltation)
40. Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as per ISO 7686, minimum required strength 25 MPa conforming to BDS-1878:2014, 4.4.1, 4.4.2 at working site as per standard practice and accepted by the Engineer-in-charge.
41. Complete installation of 100 mm dia uPVC tube-well fixtures such as expanded top pipes,. reducer, tube-well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing with best quality PVC solution, iron screws and uPVC tape and placing in position with proper size M.S. centralizer @ 3 meter c/c. in strainer portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. Show Breakup meter 133 131 126 126
42. Complete development of the tube-well by air compressor and pump of suitable capacity by alternate surging and pumping until satisfactory yield of sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding)
43. Complete installation of 150 mm dia uPVC tube-well fixtures such as expanded top pipes, reducer, tube-well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing with best quality uPVC solution, iron screws and uPVC tape and placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. Show Breakup meter 129 127 124 124
44. Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding)
45. Protective top cover: Supplying fitting and fixing of best quality 250 mm dia 4 mm thick M.S. pipe 1.0 m (3'-4") long one end blocked with 300 dia 4 mm thick M.S. plate and other end minimum 300 (1'-0") embedded in sanitary seal for protection of uPVC Housing pipe as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 10956 10925 10803 10803
46. INSTALLATION OF 150 mm x 300 mm DIA SHROUDED
47. PRODUCTION WELL WITH G.I. PIPE
48. Boring: Execution of 600 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) for boring 600 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at every change of formation including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth of boring required for caving and siltation)
49. Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as per specification and accepted by the Engineer-in-charge. Show Breakup hour 1316 1313 1300 1300
50. Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 2877 2877 2877 2877
51. Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard specification and accepted by the Engineer-in-charge. Show Breakup meter 85 83 78 78
52. INSTALLATION OF 200 mm x 400 mm DIA SHROUDED
53. PRODUCTION WELL WITH G.I. PIPE
54. Boring: Execution of 800 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter). For boring 800 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at every change of formation including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed form G.L. to bottom of the blind pipe and the rate is required for caving and siltation)
55. Supplying the following tube well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060 max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a) manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at working site as per standard practice and accepted by the Engineer-in-charge.
56. Complete installation of 150 mm dia deep tube-well fixtures such as expanded top pipes, reducer, tube-well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing socket, welding and additional welding with fibre and placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including. blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. Show Breakup meter 805 790 732 732
57. Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding)
58. Complete installation of 200 mm dia deep tube well fixtures such as expanded top pipes, reducer, and tube well pipes, strainer, blind pipe. pipe cap etc. Fitting and fixing socket, welding and additional welding with fibre and placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer position including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. Show Breakup meter 879 863 799 799
59. Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of shrouding).
60. Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as per specification and accepted by the Engineer-in-charge. Show Breakup hour 1361 1359 1346 1346
61. Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated water having 150 ppm available free chlorine complete as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 3288 3288 3288 3288
62. Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard specification and accepted by the Engineer-in-charge. Show Breakup meter 85 83 78 78
63. INSTALLATION OF 50 mm x 150 mm DIA SHROUDED
64. PRODUCTION WELL WITH G.I. PIPE
65. Boring: Execution of 325 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) for boring 325 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at every change of formation including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth of boring required for caving and siltation)
66. Supplying the following tube-well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060 max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a) manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at working site as per standard practice and accepted by the Engineer-in-charge.
67. Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 1644 1644 1644 1644
68. Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard specification and accepted by the Engineer-in-charge. Show Breakup meter 48 47 44 44
69. INSTALLATION OF 75 mm x 150 mm DIA SHROUDED
70. PRODUCTION WELL WITH G.I. PIPE
71. Boring: Execution of 350 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) for boring 350 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at every change of formation including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth of boring required for caving and siltation)
72. Supplying the following tube-well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060 max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a) manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at working site as per standard practice and accepted by the Engineer-in-charge.
73. Complete installation of 50 mm dia deep tube-well fixtures such as expanded top pipes, reducer, tube-well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing socket, welding and additional welding with fibre and placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including. blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge Show Breakup meter 805 790 732 732
74. Compete development of the tube well by suitable air compressor and pump of suitable capacity by alternate surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge (Development should be started within 24 hours of completion of shrouding)
75. Complete installation of 75 mm dia deep tube-well fixtures such as expanded top pipes, reducer, tube-well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing socket, welding and additional welding with fibre and placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. Show Breakup meter 771 758 702 702
76. Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge(Development should be started within 24 hours of completion of shrouding).
77. Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as per specification and accepted by the Engineer-in-charge. Show Breakup hour 1202 1199 1186 1186
78. Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 1997 1997 1997 1997
79. Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard specification and accepted by the Engineer-in-charge. Show Breakup meter 56 54 51 51
80. INSTALLATION OF 100 mm x 200 mm DIA SHROUDED
81. PRODUCTION WELL WITH G.I. PIPE
82. Supplying the following tube-well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060 max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a) manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at working site as per standard practice and accepted by the Engineer-in-charge.
83. Complete installation of 100 mm dia deep tube-well fixtures such as expanded top pipes, reducer, and tube-well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing socket, welding and additional welding with fibre and placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge Show Breakup meter 742 732 692 692
84. Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using necessary quantity of calgon and conducting step draw down test before and after the development as per specification and accepted by the Engineer-in-charge (Development should be started within 24 hours of completion of shrouding)
85. Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as per specification and accepted by the Engineer-in-charge Show Breakup hour 1248 1245 1232 1232
86. Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the Engineer-in-charge Show Breakup each 2349 2349 2349 2349
87. Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard specification and accepted by the Engineer-in-charge Show Breakup meter 63 61 58 58
88. INSTALLATION OF 40 MM DIA uPVC HAND TUBE WEL
89. Supplying and sinking of 40 mm dia water grade uPVC tube well pipe having wall thickness 2.5 mm to 3.0 mm including trial boring and with all necessary fittings as required etc. all complete and accepted by the Engineer-in-charge.
90. Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as per specification and accepted by the Engineer-in-charge. Show Breakup hour 1275 1272 1259 1259
91. Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the Engineer-in-charge. each 2819 2819 2819 2819
92. Supplying and sinking of 3 m long uPVC strainer with all necessary fittings as required etc. complete and accepted by the Engineer-in-charge. Show Breakup each 702 698 683 683
93. Supplying, fitting and fixing of No. 6 pump for 40 mm dia tube well with all necessary fittings including 0.61 m long 40 mm dia G.I. Pipe etc. all complete as per accepted by the Engineer-in-charge. Show Breakup each 4167 4167 4167 4167
94. DEEP SET HAND OPERATED TUBE WELL
95. Supplying and sinking uPVC, tube well pipe, uPVC strainer including trial boring with all necessary fittings as required etc. all complete and accepted by the Engineer-in-charge.
96. Supplying, fitting and fixing of deep set tube well pump (Hand set) with all necessary fittings as required such as No. 6 pump, 50 mm dia G.I. pipe 0.61 m long, 50 mm x 40 mm reducing socket, 40 mm dia pipe Nipple 1.22 m long cylinder, tie foot ball, tie plunger, 3 Nos. 10 mm dia sockets, 4 Nos. 10mm dia nuts, 5 Nos. end threaded 10 mm dia M.S. rod 3 m long, necessary quantity of solution and tape etc. complete and accepted by the Engineer-in-charge. Show Breakup each 8248 8224 8126 8126
97. 27.1 Mobilization of test boring or observation well: Transportation of materials, equipments, tools and plants and boring rig to work site. Construction of derrick and dismantling the same. Cleaning the site after completion of the work accepted by the Engineer-in-charge. Show Breakup per set 7853 7853 7853 7853
98. 27.10 Boring: Execution of 325 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter). Boring for 325 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval or as required and at every change in soil stratum including sinking and with drawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from E.G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth or of further boring required due to caving and siltation)
99. 27.10.1 From 0.0 m to 50 m = 50 m Show Breakup meter 957 957 957 957
100. 27.10.2 From 50 m to 100 m = 50 m meter 1101 1101 1101 1101
101. 27.10.3 From 100 m to 152 m = 52 m meter 1266 1266 1266 1266
102. 27.10.4 From 152 m to 200 m = 48 m meter 1456 1456 1456 1456
103. 27.10.5 From 200 m to 250 m = 50 m meter 1674 1674 1674 1674
104. 27.10.6 Beyond 250 m meter 1925 1925 1925 1925
105. 27.11.1 Best quality 50 mm dia uPVC cap Show Breakup each 177 176 172 172
106. 27.11.2.1 50 mm dia water grade (Class D) uPVC blind pipe/sand trap of wall thickness 3.1 mm to 3.7 mm Show Breakup meter 263 263 259 259
107. 27.11.2.2 50 mm dia water grade (Class E) uPVC blind pipe/sand trap of wall thickness 3.9 mm to 4.5 mm Show Breakup meter 331 330 327 327
108. 27.11.3.1 50 mm dia strainer of any slot as per design made with grade(Class D) uPVC pipe of wall thickness 3.1 mm to 3.7 mm Show Breakup meter 353 351 341 341
109. 27.11.3.2 50 mm dia strainer of any slot as per design made with grade(Class E) uPVC pipe of wall thickness 3.9 mm to 4.5 mm Show Breakup meter 421 418 409 409
110. 27.11.4 Best quality 50 mm x 125 mm dia uPVC Reducer Show Breakup meter 1096 1095 1091 1091
111. 27.11.5.1 125mm dia water grade (Class D) uPVC housing pipe of wall thickness 7.3 to 8.4mm Show Breakup meter 1283 1282 1279 1279
112. 27.11.5.2 125mm dia water grade (Class E) uPVC housing pipe of wall thickness 9.0 to 10.4mm Show Breakup meter 1517 1516 1512 1512
113. 27.11.6 Supplying centralizer made with 12 mm dia M.S. rod of approved design Show Breakup each 500 497 487 487
114. 27.13.1 Wells up to 200 m depth Show Breakup each 31289 31289 31289 31289
115. 27.13.2 Wells beyond 200 m depth each 39633 39633 39633 39633
116. 27.18.1 From 0.0 m to 50 m = 50 m Show Breakup meter 1043 1043 1043 1043
117. 27.18.2 From 50 m to100 m = 50 m meter 1199 1199 1199 1199
118. 27.18.3 From 100 m to 152 m = 52 m meter 1379 1379 1379 1379
119. 27.18.4 From 152 m to 200 m = 48 m meter 1586 1586 1586 1586
120. 27.18.5 From 200 m to 250 m = 50 m meter 1824 1824 1824 1824
121. 27.18.6 Beyond 250 m meter 2098 2098 2098 2098
122. 27.19.1 Best quality 75 mm dia uPVC cap Show Breakup each 238 237 233 233
123. 27.19.2.1 75 mm dia water grade(Class D) uPVC blind pipe/sand trap of wall thickness 4.6 mm to 5.3 mm Show Breakup meter 523 522 518 518
124. 27.19.2.2 75 mm dia water grade(Class E ) uPVC blind pipe/sand trap of wall thickness 5.7 mm to 6.6 mm Show Breakup meter 659 658 654 654
125. 27.19.3.1 75 mm dia strainer of any slot as per design made with water grade (Class D) uPVC pipe of wall thickness 4.6 mm to 5.3 mm Show Breakup meter 604 601 591 591
126. 27.19.3.2 75 mm dia strainer of any slot as per design made with water grade (Class E) uPVC pipe of wall thickness 5.7 mm to 6.6 mm Show Breakup meter 740 737 728 728
127. 27.19.4 Best quality 75 mm x 150 mm dia uPVC Reducer Show Breakup each 1571 1570 1566 1566
128. 27.19.5.1 150 mm dia water grade(Class D) uPVC housing pipe having wall thickness 8.8 mm to 10.2 mm Show Breakup meter 2114 2113 2109 2109
129. 27.19.5.2 150 mm dia water grade(Class E) uPVC housing pipe having wall thickness 10.8 mm to 12.5 mm Show Breakup meter 2576 2575 2571 2571
130. 27.19.6 Supplying of centralizer made with 12 mm dia M.S. rod of approved design Show Breakup meter 500 497 487 487
131. 27.2.1 From 0.0 m to 50 m = 50 m Show Breakup meter 196 196 196 196
132. 27.2.2 Above 50 m to 100 m = 50 m Show Breakup meter 226 226 226 226
133. 27.2.3 Above 100 m to 152 m = 52 m meter 260 260 260 260
134. 27.2.4 Above 152 m to 200 m = 48 m meter 299 299 299 299
135. 27.2.5 Above 200 m to 250 m = 50 m meter 343 343 343 343
136. 27.2.6 Beyond 250 m meter 395 395 395 395
137. 27.20 Complete installation of 75 mm dia uPVC tube-well fixtures such as expanded top pipes, reducer, tube-well pipes, strainer, blind pipe, pipe cap etc fitting and fixing with best quality uPVC solution, iron screws and uPVC tape and placing in position with proper size M.S. centralizer @ 3 meter c/c .in strainer portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge. Show Breakup meter 112 110 107 107
138. 27.21.1 Wells up to 200 m depth Show Breakup each 41474 41474 41474 41474
139. 27.21.2 Wells beyond 200 m depth each 49768 49768 49768 49768
140. 27.26.1 From 0.0 m to 50 m = 50 m Show Breakup meter 1092 1092 1092 1092
141. 27.26.2 From 50 m to 100 m = 50 m meter 1256 1256 1256 1256
142. 27.26.3 From 100 m to 152 m = 52 m meter 1444 1444 1444 1444
143. 27.26.4 From 152 m to 200 m = 48 m meter 1661 1661 1661 1661
144. 27.26.5 From 200 m to 250 m = 50 m meter 1910 1910 1910 1910
145. 27.26.6 Beyond 250 m meter 2197 2197 2197 2197
146. 27.27.1 Best quality 100 mm dia uPVC cap Show Breakup each 545 544 540 540
147. 27.27.2.1 100 mm dia water grade (Class D) uPVC blind pipe/ sand trap having wall thickness 6.0 mm to 6.9 mm Show Breakup meter 706 705 701 701
148. 27.27.2.2 100 mm dia water grade (Class E) uPVC blind pipe/ sand trap having wall thickness 7.3 mm to 8.4 mm Show Breakup meter 1025 1024 1020 1020
149. 27.27.3.1 100 mm dia strainer of any slot as per design made with water grade(Class D) uPVC pipe having wall thickness 6.0 mm to 6.9 mm Show Breakup meter 787 784 774 774
150. 27.27.3.2 100 mm dia strainer of any slot as per design made with water grade(Class E) uPVC pipe having wall thickness 7.3 mm to 8.4 mm Show Breakup meter 1106 1103 1093 1093
151. 27.27.4 Best quality 100 mm x 200 mm dia uPVC reducer Show Breakup each 2324 2323 2319 2319
152. 27.27.5.1 200 mm dia water grade (Class D ) uPVC housing pipe having wall thickness 10.3 mm to 11.9 mm Show Breakup meter 3180 3179 3176 3176
153. 27.27.5.2 200 mm dia water grade( Class E ) uPVC hjousing pipe having wall thickness 12.6 mm to 14.8 mm Show Breakup meter 3826 3825 3821 3821
154. 27.27.6 Supplying centralizer made with 12 mm dia M.S. rod of approved design Show Breakup each 500 497 487 487
155. 27.29.1 Wells up to 200 m depth Show Breakup each 50922 50922 50922 50922
156. 27.29.2 Wells beyond 200 m depth each 61106 61106 61106 61106
157. 27.3 Installation of tube-well fixture for observation well: Supplying and lowering of 40/38 mm inside dia best quality uPVC pressure tube well pipe (specific gravity 1.35 - 1.45, wall thickness 2.5 mm - 3.0 mm capable to withstand a minimum hydrostatic pressure of 170 psi for 1 hr). Fitting and fixing in position with all accessories, uPVC sand trap of length 3.00m with uPVC strainer of desired slot installing in or at mid depth of the most suitable water bearing strata, 38 mm dia, best quality G.I. pipe of length 1.52 m with M.S. welded flat bar welded on each side to prevent from rotation up to desired depth, fitting, fixing the best quality no. 6 C.I. head hand-pump etc including the cost of solvent cement, socket adapter, filling medium sand up to 18.00 m above strainer and the remaining portion with available soil from boring etc. complete as per standard specification and accepted by the Engineer-in-charge.
158. 27.3.1 Fitting & fixing of no. 6 Hand-pump set including all necessary accessories etc Show Breakup per set 3460 3455 3436 3436
159. 27.3.2 Supplying and fitting 38/40 mm dia heavy type G.I pipe conforming to standard BS-1387 & BDS-1031, having chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060 max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a) manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe having wall thickness 2.9 mm, weight 3.517 kg/m capable to withstand 50 kg/cm2 hydraulic pressure Show Breakup meter 1017 1013 997 997
160. 27.3.3 38/40 mm dia water grade uPVC pipe having wall thickness 2.5 mm -3.00 mm Show Breakup meter 220 219 215 215
161. 27.3.4 38/40 mm dia water grade uPVC strainer having wall thickness 2.5 mm -3.00 mm Show Breakup meter 291 289 282 282
162. 27.3.5 38/40 mm dia uPVC socket adapter Show Breakup each 132 131 129 129
163. 27.3.6 Best quality 38 mm dia uPVC cap Show Breakup each 107 107 104 104
164. 27.3.7 Supplying, fitting & fixing tube-well log describing technical information of the tube-well Show Breakup each 5006 5006 5006 5006
165. 27.3.8 Filling the top 0.6 meter of the bore hole around the top pipe with sanitary seal of 1:2:4 (Cement: 1.2 FM sand: 20 mm downgraded brick chips) concrete each 59 59 58 58
166. 27.30 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as per specification and accepted by the Engineer-in-charge. Show Breakup hour 1123 1120 1107 1107
167. 27.31 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the Engineer-in-charge. Show Breakup each 2349 2349 2349 2349
168. 27.34.1 From 0.0 m to 50 m = 50 m Show Breakup meter 1374 1374 1374 1374
169. 27.34.2 From 50 m to 100 m = 50 m Show Breakup meter 1580 1580 1580 1580
170. 27.34.3 From 100 m to 152 m = 52 m meter 1817 1817 1817 1817
171. 27.34.4 From 152 m to 200 m = 48 m meter 2090 2090 2090 2090
172. 27.34.5 From 200 m to 250 m = 50 m meter 2404 2404 2404 2404
173. 27.34.6 Beyond 250 m meter 2764 2764 2764 2764
174. 27.35.1 Best quality 150 mm dia uPVC cap for blind pipe/ sand trap. Show Breakup each 1144 1143 1139 1139
175. 27.35.2.1 150 mm dia water grade(Class D) uPVC blind pipe/ sand trap having wall thickness 8.8 mm to 10.2 mm Show Breakup meter 1816 1815 1811 1811
176. 27.35.2.2 150 mm dia water grade(Class E) uPVC blind pipe/ sand trap having wall thickness 10.8 mm to 12.5 mm Show Breakup meter 2212 2211 2207 2207
177. 27.35.3.1 150 mm dia strainer of any slot as per design made with water grade(Class D) uPVC pipe of wall thickness 8.8 to 10.2 mm Show Breakup meter 1917 1914 1903 1903
178. 27.35.3.2 150 mm dia strainer of any slot as per design made with water grade(Class E) uPVC pipe of wall thickness 10.8 to 12.5 mm Show Breakup meter 2314 2311 2299 2299
179. 27.35.4.1 Best quality 150 mm x 200 mm dia uPVC Reducer Show Breakup each 2531 2530 2525 2525
180. 27.35.4.2 Best quality 150 mm x 250 mm dia uPVC Reducer Show Breakup each 3749 3747 3742 3742
181. 27.35.5.1 200 mm dia water grade(Class D) uPVC housing pipe of wall thickness 10.3 mm to 11.9 mm Show Breakup meter 3180 3179 3176 3176
182. 27.35.5.2 200 mm dia water grade(Class E) uPVC housing pipe of wall thickness12.6 mm to 14.8 mm Show Breakup meter 3826 3825 3821 3821
183. 27.35.5.3 250 mm dia water grade(Class D) uPVC housing pipe of wall thickness 12.8 mm to 14.8 mm Show Breakup meter 4410 4409 4405 4405
184. 27.35.5.4 250 mm dia water grade(Class E) uPVC housing pipe of wall thickness 15.7 mm to 18.1 mm Show Breakup meter 5870 5869 5865 5865
185. 27.35.6 Supplying of centralizer made with 12 mm dia M.S. rod of approved design Show Breakup meter 500 497 487 487
186. 27.37.1 Wells up to 200 m depth Show Breakup each 60861 60861 60861 60861
187. 27.37.2 Wells beyond 200 m depth each 68975 68975 68975 68975
188. 27.4 Complete development of the tube well to obtain sand and turbidity free water at a satisfactory yield confirmed by tests as per specification and accepted by the Engineer-in-charge. Water sample must be taken from 3 separate aquifers from three tube-wells
189. 27.4.1 Wells up to 200 meter depth
190. 27.4.1.1 For 1 No. test tube-well Show Breakup each 8835 8835 8835 8835
191. 27.4.1.2 For 2 Nos. test tube-wells each 13253 13253 13253 13253
192. 27.4.1.3 For 3 Nos. test tube-wells each 17670 17670 17670 17670
193. 27.4.2 Wells beyond 200 meter depth
194. 27.4.2.1 For 1 No. test tube-well meter 51 51 51 51
195. 27.4.2.2 For 2 Nos. test tube-wells meter 76 76 76 76
196. 27.4.2.3 For 3 Nos. test tube-wells meter 102 102 102 102
197. 27.40 Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by withdrawn selected soil or local clay as free from any substances harmful to pipes and health per standard specification and accepted by the Engineer-in-charge. Show Breakup meter 85 83 78 78
198. 27.42.1 From 0.0 m to 50 m = 50 m Show Breakup meter 1374 1374 1374 1374
199. 27.42.2 From 50 m to 100 m = 50 m Show Breakup meter 1580 1580 1580 1580
200. 27.42.3 From 100 m to 152 m = 52 m Show Breakup meter 1817 1817 1817 1817
201. 27.42.4 From 152 m to 200 m = 48 m meter 2090 2090 2090 2090
202. 27.42.5 From 200 m to 250 m = 50 m meter 2404 2404 2404 2404
203. 27.42.6 Beyond 250 m meter 2764 2764 2764 2764
204. 27.43.1 150 mm dia M.S. cap 6 mm thick for blind pipe/sand trap Show Breakup each 1551 1550 1546 1546
205. 27.43.2 150 mm dia G.I. Pipe having wall thickness 5.4 mm, weight 21.2 kg/m can withstand 50 kg/ cm2 hydraulic pressure for blind pipe/sand trap Show Breakup meter 3788 3785 3773 3773
206. 27.43.3 150 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously.
207. 27.43.3.1 Stainless steel strainer of continuous slot having weight 28.84 kg per meter. Show Breakup meter 18358 18356 18346 18346
208. 27.43.3.2 2.50 mm thick stainless steel Bridge type strainer. Show Breakup meter 13947 13944 13935 13935
209. 27.43.4 150 mm x 300 mm dia M.S. reducer of minimum thickness of 6 mm. Show Breakup each 3307 3301 3276 3276
210. 27.43.5 300 mm dia 6 mm minimum thick M.S. housing pipe (Seamless) Show Breakup meter 10460 10454 10430 10430
211. 27.43.6 Centralizer made with 12 mm dia M.S. rod of approved design. Show Breakup each 500 497 487 487
212. 27.43.7 350 mm dia M.S. cap having 6 mm thick for housing pipe covering. Show Breakup each 3509 3495 3436 3436
213. 27.45.1 Wells up to 200 m depth Show Breakup each 60861 60861 60861 60861
214. 27.45.2 Wells beyond 200 m depth each 68975 68975 68975 68975
215. 27.49.1 From 0.0 m to 50 m = 50 m Show Breakup meter 1546 1546 1546 1546
216. 27.49.2 From 50 m to 100 m = 50 m meter 1778 1778 1778 1778
217. 27.49.3 From 100 m to 152 m = 52 m meter 2045 2045 2045 2045
218. 27.49.4 From 152 m to 200 m = 48 m meter 2351 2351 2351 2351
219. 27.49.5 From 200 m to 250 m = 50 m meter 2704 2704 2704 2704
220. 27.49.6 Beyond 250 m meter 3110 3110 3110 3110
221. 27.5.1 Furnishing design considering 1 No. test bore Show Breakup LS 37670 37670 37670 37670
222. 27.5.2 Furnishing design considering 2 Nos. test bores Show Breakup LS 73267 73267 73267 73267
223. 27.5.3 Furnishing design considering 3 Nos. test bores LS 109901 109901 109901 109901
224. 27.50 Supplying the following tube-well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060 max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a) manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at working site as per standard practice and accepted by the Engineer-in-charge.
225. 27.50.1 200 mm dia M.S. cap 6mm thick for blind pipe/ sand strap Show Breakup each 1968 1967 1963 1963
226. 27.50.2 200 mm dia 6 mm thick tube well pipe and blank G.I. pipe of wt. 33.45 kg per meter can withstand minimum 700 psi hydraulic pressure. Show Breakup meter 7776 7773 7761 7761
227. 27.50.3 200 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously. Show Breakup meter
228. 27.50.3.1 200 mm dia stainless steel strainer of continuous slot having 38.36 kg per meter. Show Breakup meter 21948 21945 21933 21933
229. 27.50.3.2 200 mm dia 2.5 mm thick stainless steel bridge type strainer Show Breakup meter 14587 14584 14572 14572
230. 27.50.4 200 mm x 400 mm dia 6 mm thick M.S. reducer. Show Breakup each 3374 3369 3350 3350
231. 27.50.5 400 mm dia 6 mm thick M.S. housing pipe (Seamless) Show Breakup meter 14510 14503 14479 14479
232. 27.50.6 Centralizer made with 12 mm dia M.S. rod of approved design Show Breakup each 500 497 487 487
233. 27.50.7 450 mm dia M.S. cap of 6 mm thick for housing pipe covering. Show Breakup each 785 773 724 724
234. 27.52.1 Wells up to 200 m depth Show Breakup each 57793 57793 57793 57793
235. 27.52.2 Wells beyond 200 m depth Show Breakup each 64592 64592 64592 64592
236. 27.56.1 From 0.0 m to 50 m = 50 m Show Breakup meter 957 957 957 957
237. 27.56.2 From 50 m to 100 m = 50 m meter 1101 1101 1101 1101
238. 27.56.3 From 100 m to 152 m = 52 m meter 1266 1266 1266 1266
239. 27.56.4 From 152 m to 200 m = 48 m meter 1456 1456 1456 1456
240. 27.56.5 From 200 m to 250 m = 50 m meter 1674 1674 1674 1674
241. 27.56.6 Beyond 250 m meter 1925 1925 1925 1925
242. 27.57.1 150 mm dia 6mm thick M.S. cap for blind pipe/ sand trap. Show Breakup each 1551 1550 1546 1546
243. 27.57.2 50 mm dia 4.85 mm thick tube well pipe and blank G.I. pipe Show Breakup meter 1175 1172 1160 1160
244. 27.57.3 50 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously. meter
245. 27.57.3.1 50 mm dia stainless steel strainer of continuous slot having 28.84 kg per meter. Show Breakup meter 7388 7386 7376 7376
246. 27.57.3.2 50 mm dia 2.5 mm thick stainless steel bridge type strainer Show Breakup meter 7388 7386 7376 7376
247. 27.57.4 50 mm x 150 mm dia 6 mm thick M.S. reducer. Show Breakup each 1350 1344 1319 1319
248. 27.57.5 150 mm dia 6 mm thick M.S. housing pipe (Seamless). Show Breakup meter 5061 5055 5031 5031
249. 27.57.6 Centralizer made with 12 mm dia M.S. rod of approved design. Show Breakup each 500 497 487 487
250. 27.57.7 150 mm dia M.S. cap of 6 mm thick for housing pipe covering. Show Breakup each 2307 2292 2233 2233
251. 27.59.1 Wells up to 200 m depth Show Breakup each 31289 31289 31289 31289
252. 27.59.2 Wells beyond 200 m depth each 35461 35461 35461 35461
253. 27.60 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as per specification and accepted by the Engineer-in-charge. Show Breakup hour 1078 1076 1064 1064
254. 27.63.1 From 0.0 m to 50 m = 50 m Show Breakup meter 1043 1043 1043 1043
255. 27.63.2 From 50 m to 100 m = 50 m meter 1199 1199 1199 1199
256. 27.63.3 From 100 m to 152 m = 52 m meter 1379 1379 1379 1379
257. 27.63.4 From 152 m to 200 m = 48 m meter 1586 1586 1586 1586
258. 27.63.5 From 200 m to 250 m = 50 m meter 1824 1824 1824 1824
259. 27.63.6 Beyond 250 m meter 2098 2098 2098 2098
260. 27.64.1 150 mm dia 6mm thick M.S. cap for blind pipe/ sand trap. Show Breakup each 1398 1397 1394 1394
261. 27.64.2 75 mm dia 4.85 mm thick tube well pipe and blank G.I. pipe Show Breakup meter 1729 1728 1724 1724
262. 27.64.3 75 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously. Show Breakup meter
263. 27.64.3.1 75 mm dia stainless steel strainer of continuous slot having 28.84 kg per meter. Show Breakup meter 9966 9963 9951 9951
264. 27.64.3.2 75 mm dia 2.5 mm thick stainless steel bridge type strainer Show Breakup meter 9900 9897 9885 9885
265. 27.64.4 75 mm x 150 mm dia 6 mm thick M.S. reducer. Show Breakup meter 1350 1344 1319 1319
266. 27.64.6 150 mm dia 6 mm thick M.S. housing pipe (Seamless) Show Breakup meter 5061 5055 5031 5031
267. 27.64.7 Centralizer made with 12 mm dia M.S. rod of approved design Show Breakup each 500 497 487 487
268. 27.64.8 150 mm dia M.S. cap of 6 mm thick for housing pipe covering. Show Breakup meter 2307 2292 2233 2233
269. 27.66.1 Wells up to 200 m depth Show Breakup each 41474 41474 41474 41474
270. 27.66.2 Wells beyond 200 m depth each 47003 47003 47003 47003
271. 27.7.1 For Tube-wells up to 100 meter depth Show Breakup per set 47977 47977 47977 47977
272. 27.7.2 For Tube-wells up to 200 meter depth per set 51404 51404 51404 51404
273. 27.7.3 For Tube-wells beyond 200 meter depth per set 54831 54831 54831 54831
274. 27.70 Boring: Execution of 400 mm dia boring through all sorts of strata by reverse circulation or any other approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) for boring 400 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at every change of formation including sinking and withdrawing necessary casing pipe and all necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement will be allowed from G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth of boring required for caving and siltation)
275. 27.70.1 From 0.0 m to 50 m = 50 m Show Breakup meter 1092 1092 1092 1092
276. 27.70.2 From 50 m to 100 m = 50 m meter 1256 1256 1256 1256
277. 27.70.3 From 100 m to 152 m = 52 m meter 1444 1444 1444 1444
278. 27.70.4 From 152 m to 200 m = 48 m meter 1661 1661 1661 1661
279. 27.70.5 From 200 m to 250 m = 50 m meter 1910 1910 1910 1910
280. 27.70.6 Beyond 250 m meter 2197 2197 2197 2197
281. 27.71.1 Supplying 150 mm dia 6mm thick M.S. cap for blind pipe/ sand trap. Show Breakup each 1551 1550 1546 1546
282. 27.71.2 Supplying 100 mm dia 6 mm thick tube well pipe and blank G.I. pipe Show Breakup meter 2596 2593 2581 2581
283. 27.71.3 100 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously. Show Breakup meter
284. 27.71.3.1 Supplying 100 mm dia stainless steel strainer of continuous slot having 28.84 kg per meter. Show Breakup meter 11197 11194 11182 11182
285. 27.71.3.2 Supplying 100 mm dia 2.5 mm thick stainless steel bridge type strainer Show Breakup meter 8550 8547 8535 8535
286. 27.71.4 Supplying 100 mm x 200 mm dia 6 mm thick M.S. reducer. Show Breakup each 1620 1615 1595 1595
287. 27.71.5 Supplying 200 mm dia 6 mm thick M.S. housing pipe (Seamless) Show Breakup meter 5258 5252 5227 5227
288. 27.71.6 Supplying centralizer made with 12 mm dia M.S. rod of approved design Show Breakup each 316 313 303 303
289. 27.71.7 Supplying 200 mm dia M.S. cap of 6 mm thick for housing pipe covering. Show Breakup each 2773 2773 2712 2712
290. 27.73.1 Wells up to 200 m depth Show Breakup each 50922 50922 50922 50922
291. 27.73.2 Wells beyond 200 m depth each 57711 57711 57711 57711
292. 27.77.1 40 mm dia pipe up to 60 m depth Show Breakup meter 278 274 258 258
293. 27.77.2 40 mm dia pipe beyond 60 m depth Show Breakup meter 493 487 463 463
294. 27.80 Construction of platform of size 1.4 m x 1.0 m and outlet drain up to1 meter long, as per drawing with 75 mm thick cement concrete of f'c min 17 MPa with brick chips and cement content relates to 1:2:4, over a brick flat soling and providing 125 mm x 75mm brick band in 1:6 all around, including finished with 12 mm thick cement plaster in 1:4 followd by neat cement finishing all complete and accepted by the Engineer-in-charge. Show Breakup each 6208 6173 5976 5927
295. 27.81.1 50 mm dia water grade uPVC pipe having wall thickness 2.5 mm to 3 mm Show Breakup meter 584 580 564 564
296. 27.81.2 40 mm dia water grade uPVC pipe having wall thickness 2.5 mm to 3 mm Show Breakup meter 382 378 362 362
297. 27.81.3 40 mm dia uPVC strainer 3.0 m long Show Breakup each 702 698 683 683
Help